Chuck and Rob did a great job. I couldn’t believe they could do the job in one day, they did it in about 6 hours. Removing previous covering of cast iron tub and tiled walls. Stripping walls down to studs, new plumbing, green board, walk in shower, glass doors and installed a new toilet. Wow what a great job. Thanks Chuck and Rob
