Easy process from sales to install. The installation crew of Alex, Cameron and Kyle arrived about 9am after a call that they were on their way. They got right to it, covering all flooring with tarps. Jumped into the demolition and on to the installation. They consulted us on the final position of grab bars and shelves and kept on installing. They were done about 2:30 pm. The work looks anazing. We are very, very happy with the finished product. You can depend on BathWorks and Jacuzzi.