Conejo Services - Internal Map of California

See Our Work in Your Neighborhood

Click to interact with the map

About Us

We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559

The company performs work related to -10000, Date Ranges, HVAC Install, HVAC, Price Ranges

Recent Work

1023 Via Colinas,Westlake Village, CA, US

50- Gallon Bradford White Water Heter InstallSold by Jeff Stone

SCOPE OF WORK (Local & California Plumbing Codes included for reference):

 - Installation of new water heater at existing water heater location.

 - Connect existing exhaust vent to water heater vent hood; ensure vent is supported, if needed, and all vent connections are fastened w/ 3 vent screws (CPC 503.3) *Price is subject to change if additional materials/modifications are required*

 - Installation of a new brass water shut off valve on the cold water line (if needed) (CPC 606.2)

 - Installation of new 3/4” dielectric stainless steel flexible connectors on the cold & hot water lines.

 - Insulate up to 5ft of the cold & hot water lines (not required in a conditioned space) (150 (J) 2)

 - Installation of a 2.1 gal. thermal expansion tank; secured/fixed to wall (CPC 608.2 & 3)

 - Installation of brass electrical bonding clamps on the cold water line, hot water line & gas line, connecting all 3 brass bonding clamps using 6 gauge copper wire to aid in the prevention of electrolysis (not required on PEX plumbing systems) (250-104 a,b)

 - Installation of uni-strut system & seismic straps (upper & lower) to prevent horizontal displacement in the event of an earthquake (CPC 507.2)

 - Installation of a new temperature & pressure relief valve (CPC 608.5)

 - Connect to existing drain line for temperature and pressure relief drain; ensure drain line is terminating at an approved location (CPC 608.5) *Price is subject to change if additional materials/modifications are required*

 - Installation of a new 1/2” brass gas shut off valve, 1/2” gas sediment/debris trap & 1/2” x 24” flexible powder coated stainless steel gas connector (CPC 1211.5 / 1212.8)

 - Installation of an aluminum drain pan beneath water heater (CPC 507.5)

 - Installation of up to 5ft of 3/4” PVC drain line from the aluminum drain pan to an approved location (CPC 507.5) *Price is subject to change if additional materials/modifications are required*

 - Cover existing water heater stand w/ sheet metal & angle iron (if applicable)


Amount to collect when done: $3,505.00


Please call Charles when on the way 3104873343


Install

Sales- Greg

Turn-Georgie F

Upflow xv-80 furnace, coil, XR14 A/C, ducting (7-8 runs)

Total - $19,084.00 (Wells Fargo, 72 months no interest)

**Customer wanted this date

  • Plumbing
  • Plumbing: Plumbing Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2025 - Q1
  • HVAC
  • HVAC: HVAC Install
  • Price Ranges: 15001 - 20000
  • Date Ranges: 2021 - Q2

445 Cremona Way,Oak Park, CA, US

Install **PRE 7AM. **TENANT NEEDED THIS DATE

Sales- kevin

Turn- N/A

Two RA14 A/C's. (1) upflow coil (for upstairs)

Total - $12,480.00 **PER KEVIN; MARISA TO CONTACT REALTOR FOR PAYMENT (JILL)

  • HVAC
  • HVAC: HVAC Install
  • Price Ranges
  • Price Ranges: 10000 - 15000
  • Date Ranges
  • Date Ranges: 2021 - Q2

Customer Reviews

There are no testimonials at this time. Check back later!