Conejo Services - Internal Map
We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559
Our Work
Scott and Katie Vroman - $37500 - 10/28/22, CA
Install **PRE 7AM **USING 4-TON R802VA075 AND 4-TON BOVB60HDNI FROM CVHA-SHOP. PLEASE MAKE SURE TO GET MODELS/SERIALS FOR CANDICE
Sales- Greg
Turn- David M
Bedrooms- Horizontal R802VA, coil, BOVB18, ducting 9 runsMain House- Horizontal R802VA, coil, BOVB18
Total - $37,500.00 *Synchrony 18 months*Code: #1740
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 35001 - 40000
- Date Ranges
- Date Ranges: 2022 - Q4
Harry Frost - $3995.4 - 4/29/25, CA
Sales: LuisDrain and remove the old water heater.
Install a new 40-gallon water heater.
Install a new drain pan.
Sheetmetal the base.
Install a new gas flex connector, water connectors, supply ball valve shut off and quake strap.
Install expansion tank at supply line of water.
Hook T&P valve up to existing copper line.
Tax and permits are included in the price of cost.
10-year tank 10-year parts and 1 year labor warranty - 40 Gal Kit - Bradford Water Heater 40 Gallon Collect: $3,995.00
Confirmed with Harry 702-985-5030 who will be on site 04/29, Afternoon
Install **MUST HAVE HOMEOWNER SIGN CHANGE ORDER.
Sales- Kevin McNerney
Turn- N/A
Mobile home: add on A/C, furnace, coil, ducting.
Total- $16,385 Customer is financing *Wells Fargo 36 months*
NO LONGER REPLACING DUCTWORK-
New total - $12,485.00
- Plumbing
- Plumbing: Water Heater Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2025 - Q2
- HVAC
- HVAC: HVAC Install
- Price Ranges: 10000 - 15000
- Date Ranges: 2020 - Q2
Bruce Culver - $12600 - 12/12/23, CA
Installation
Sales- Greg
Turn- Dakota
5TON Upflow S8X1 furnace, coil, BOVA15 A/C, Honeywell #T6
Total due - $12,600.00 *Luz to call homeowner for payment; tenant situation*
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 10000 - 15000
- Date Ranges
- Date Ranges: 2023 - Q4
Dave Parr - $8750 - 5/4/20, CA
Install **MUST HAVE CUSTOMER SIGN WELLS FARGO FORM- THEY KEEP BOTTOM COPY, BRING TOP BACK TO OFFICE, PLEASE.
Sales- Greg Jamroz
Turn- Alfredo
A/C and ductwork.
Collect check: $3,750.00
Financing: $5,000.00 _ Wells Fargo 18 months/no interest
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2020 - Q2
2885 Amber Wood Place, CA
Install **MANUEL/CHRISTIAN TO PICK UP COIL/FURNACE FROM LENNOX PARTS PLUS IN THE MORNING**
Sales- Kevin McNerney
Turn- N/A
Upflow furnace, coil, A/C, ducting.
Total- $13,500.00 *Financing, Wells Fargo*
- Roofing
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 10000 - 15000
- Date Ranges
- Date Ranges: 2020 - Q2
Customer Testimonials
There are no testimonials at this time. Check back later!