Conejo Services - Internal Map
We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559
Our Work
Molly Telford - $10300 - 7/8/21, CA
Install
Sales- Greg
Turn- Ralph
Add on mini split (single head), 50 gallon water heater
Deposit; $1,000.00 (Visa)
Total due: $9,300.00 (Ask homeowner if they would like to use same Visa, or check)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 10000 - 15000
- Date Ranges
- Date Ranges: 2021 - Q3
Dave Pollock - $32000 - 10/5/21, CA
Install **PLEASE HAVE HOMEOWNER SIGN FINANCING FORMS**
Sales- Greg
Turn- Ralph
U/S - Horizontal R802VA, coil, BOVB18 condenser
D/S - Horizontal R802VA, coil, BOVB18 condenser
Total - $32,000.00 *Financing; Synchrony*
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 30001 - 35000
- Date Ranges
- Date Ranges: 2021 - Q4
Gary Pesselnick - $16500 - 9/28/21, CA
Install
Sales- Greg
Turn- N/A
Horizontal R802VA furnace, coil, Bosch BOVB18 A/C, duct sealing.
Deposit: $1,000.00 (check)
Total due: $15,500.00 (check)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 15001 - 20000
- Date Ranges
- Date Ranges: 2021 - Q3
Terre Ward - $3832 - 5/21/25, CA
Sales: JohnReplacement of an existing 40-gallon gas water heater in a garage with no recirculation pump. Connect Watts 210 gas T&P valve and piping.
Location: hallway closet
Recirculation Pump: No
Tasks:
Preparation and Shutoff:
1. Shut off gas supply valve
2. Close main water supply
3. Drain existing water heater to empty tank
Removal of Existing Unit:
1. Disconnect gas line from heater
2. Detach cold and hot water supply lines
3. Remove and dispose of old unit per local regulations
New Water Heater Installation:
1. Position new 40-gallon unit with adequate clearance per code
2. Install new drain pan beneath unit
3. Connect new stainless steel water supply lines (cold and hot)
4. Install 1/4-turn ball valve on cold water inlet
5. Install expansion tank, adjusted to home water pressure (typically 50-60 PSI)
6. Fit new gas shutoff valve on gas line
7. Attach new flexible gas supply line with sediment trap
8. Secure unit with Unistrut mounting and earthquake straps
9. Reconnect to existing Watts 210 T&P valve
10. Insulate water supply lines for efficiency
11. Install copper bonding wire from water lines to gas line for grounding
12. Cover base/stand with sheet metal for protection
Venting and Combustion:
1. Install venting per manufacturer’s specs (e.g., double-wall or single-wall as required)
2. Secure single-wall vent connections with 3 screws each
3. Verify adequate combustion air supply per code
Testing and Startup:
1. Pressure-test gas and water connections for leaks
2. Fill tank and purge air from lines
4. Light pilot, set temperature to 120°F (or per client preference), and confirm burner ignition
5. Validate full operational status
Cleanup and Final Steps:
1. Clear debris from work area
2. Haul away old unit for disposal
3. Conduct final inspection with client walkthroughCollect: $3,832.00
Confirmed with Terre 818-470-0587 who will be on site 05/21
Installation
Sales- Brice
Turn- Dakota3TON Upflow R801 furnace, coil, BOAVA15 A/CDeposit - $1,000.00 (check)
Total due - $15,658.00 (check)
- Plumbing
- Plumbing: Water Heater Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2025 - Q2
- HVAC
- HVAC: HVAC Install
- Price Ranges: 10000 - 15000
- Date Ranges: 2025 - Q1
Gary and Gloria Hansen - $34550 - 2/20/25, CA
Installation
Sales- Greg
Turn- Dan
5TON Horizontal R802VA furnace ,coil, BOVA15 A/C, ducting 10-11 runs, zoning, CleanEffects, (2) Honeywell #T6
Financing - $30,000.00 *7.99 fixed Synchrony*
Collet check - $4,550.00
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 30001 - 35000
- Date Ranges
- Date Ranges: 2025 - Q1
Customer Testimonials
There are no testimonials at this time. Check back later!