About Us
Recent Work
425 Ravensbury Street,Lake Sherwood, CA, US
Installation
Sales- Greg
Turn-Bill
MID LEVEL- 3TON upflow R801CA furnace/coil, RA14
Total due - $12,950.00 (CC on contract)
Gate Code #1776
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 10000 - 15000
- Date Ranges
- Date Ranges: 2024 - Q2
5756 Hidden Brook Court,Westlake Village, CA, US
Sales: Chip
Turn: Dakota
PANTRY/KITCHEN/DINING/FAMILY- 5TON horizontal S8V2 furnace/coil, BOVA15 A/C
Total due
Collect: $16,310 (CC or check)
Per Chip: This total reflects $500 discount
Installation
Sales- Chip
Turn- N/A
Remove existing split system. Install new mini split (ductless, 1 head)
Total due - $9,355.00 (CC)
Sales: JohnDrain disconnect and remove existing 75 gallon Bradford white water heater still under warranty. Water heater was installed in 2020.
Repair leaking copper pipe behind on top of water heater and cut out old solar, water heater lines and copper piping. Solder and ball valve. Install new straps (3) and backing.. Sheet metal stand and set emergency drip pan. Set existing 75 gallon Bradford white water heater back up. Make new connections to gas and water. Install necessary code items, including new expansion tank. Connect existing recirculating pump back onto water heater.
One year can I warranty on labor and materials
No warranty on existing water heater or recirculating pump.Collect: $4,067.90
Confirmed with Zoila 805-506-0364 who will be on site 04/22
- Plumbing
- Plumbing: Plumbing Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2025 - Q2
- HVAC
- HVAC: HVAC Install
- Date Ranges: 2025 - Q4
- Price Ranges: 15001 - 20000
- Date Ranges: 2023 - Q4
3801 Mainsail Circle,Westlake Village, CA, US
Install
Sales- Greg Jamroz
Turn- N/A
U/S- Horizontal furnace, coil, A/C, duct mod
D/S- A/C
Deposit: $1,000.00 (check)
Total due: $18,300.00 (check)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 15001 - 20000
- Date Ranges
- Date Ranges: 2020 - Q1
3905 Clearford Court,Westlake Village, CA, US
Install
Sales- Greg
Turn- Jesse
Upflow furnace only
Deposit; $649.00 (CC)
Total due: $5,841.00 (CC)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2021 - Q2
5230 Via Capote,Thousand Oaks, CA, US
Install **PRE 7AM
Sales- Greg
Turn- George Lechuga
U/S- Horizontal R802VA, coil, BOVB18, enlarge return
D/S- Horizontal R802VA, coil, BOVB18, enlarge return
Deposit: $1,000.00 (Visa)
Total due: $29,500.00 (Ask homeowner if they would like to provide check, or use same CC as deposit)
Install Noritz NRCR111DV**PLEASE TAKE A PICTURE OF THE VENT FOR FLASHING**
Sold by Jesse
**UPON COMPLETION, PLEASE COLLECT $6,900.00**
Please call Dennis when on the way 818-723-3682
- Plumbing
- Plumbing: Water Heater Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2024 - Q2
- HVAC
- HVAC: HVAC Install
- Price Ranges: 30001 - 35000
- Date Ranges: 2022 - Q1
Customer Reviews
There are no testimonials at this time. Check back later!