Take a look at our past work!

Conejo Services - Internal Map

We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559

The company performs work related to Price Ranges, HVAC Install, Date Ranges, HVAC, -10000

Our Work

Bernie Leibovitch, CA

Tear Off/Material load Mon 10/27Insp Tues 10/28Done fri 10/31

Starter board has been replaced fascia as well Underlayment is down starting to set tile. Lower section in the back of house still hasn’t been removed.

Customer approved Sat if needed

  • Date Ranges
  • Date Ranges: 2025 - Q4
  • HVAC
  • Price Ranges
  • Price Ranges: 20001 - 25000
ALS Environmental, CA

Installation **CRANE ARRIVAL 9:30AM, DANNY'S CRANE

Sales- Ralph

Turn- Eric

3TON rooftop Day and NIGHT package unit.

Total due - $12,119.00 (CHECK)

  • Date Ranges
  • Date Ranges: 2025 - Q4
  • HVAC
  • HVAC: HVAC Install
  • Price Ranges
  • Price Ranges: 10000 - 15000
PMP Management, CA
  • Date Ranges
  • Date Ranges: 2025 - Q4
  • HVAC
  • Price Ranges
  • Price Ranges: -10000
Kristin Guy, CA

Installation **TWO DAY PROJECT 10/31 + 11/3 ***IMPORTANT; FRIDAY START WITH DUCTING AND A/C... DO NOT DO FURNACE/COIL UNTIL MONDAY

Sales- Jesse

Turn- N/A

4TON Upflow S8V2 furnace, coil, BOVA15 A/C, ducting 10 runs, NUVE thermostat, CleanEffects

Deposit - $1,000.00 (CC)

Total due - $25,550.00 (CC OR CHECK; SEE IF CLIENT WANTS TO USE SAME CC AS DEPOSIT)

Sales-BillReroute 1/2 cold water line around the house for refrigerator feed

Shut water off to the houseCut and tie into the cold water hose bib line under kitchen window

Install a isolation valve at point of tie in

Run new 1/2” piping and shallow channel uni strut along the bottom of the house around the left corner of the house and in a clear spot run up the wall and into the attic. Approximately 30’.

From the attic, tie in with 1/2” pex. Run new pex line into the cabinet above the fridge. Approximately 15’. Install a new 1/4” quarter turn shut off. From the shut off run 1/4” blue tubing down and tie into the existing fridge line. Test and bleed system. Caulk around hole going into the attic.

CVHS provides a 1 year warranty on parts and labor

Customer to paint piping after we are done. Hold of on insulation

Pricing reflects courtesy discount for multiple jobs done at the same time

Install C/S Moen Shower Valve in U/S Guest Shower

Shut water off to house

Using customer supplied repair plate template. Open tile around existing valve

Cut out existing Delta shower valve

Install new Customer supplied Moen shower valve

Test and install new trim, tub spout and shower head

Seal up new trim

NOTE- No warranty on customer supplied materials

Pricing reflects courtesy discount per multiple jobs being done at the same time

Install C/S 1" Moen Flo (inside garage using softener loop)Shut water off to house and drain

Cut and rebuild 1” manifold to fit new 1” Moen Flo

Install new customer supplied Moen Flo

Test and take pics. Use existing electrical receptacle

Help customer set up app if necessary

NOTE- No warranty on customer supplied materials

Pricing replaces courtesy discount per multiple jobs being done at the same time

CC or Check: $2916.60

  • Date Ranges
  • Date Ranges: 2025 - Q4
  • HVAC
  • Price Ranges
  • Price Ranges: -10000
  • HVAC: HVAC Install
  • Price Ranges: 25001 - 30000
PMP Management, CA
  • Date Ranges
  • Date Ranges: 2025 - Q4
  • HVAC
  • Price Ranges
  • Price Ranges: -10000

Customer Testimonials

There are no testimonials at this time. Check back later!