Conejo Services - Internal Map
We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559
Our Work
Jade Marx-Ruiz - $8000 - 12/29/20, CA
Install
Sales- Greg Jamroz
Turn- Matt Coplan
Upflow furnace and coil
Total- $8,000.00 (CC or check, did not specify)
Please call when you are on your way (323) 401-2386
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2020 - Q4
Ruth Martin - $29000 - 9/6/24, CA
Installation **8AM SHARP!!
Sales- Greg
Turn- Eric
D/S- 4TON horizontal R801 furnace/coil, BOVA15 A/C, new return.U/S- 3TON horiz r801 furnace/coil, BOVA15 A/C
Total due - $29,000.00 *Wells Fargo 12 months*
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 25001 - 30000
- Date Ranges
- Date Ranges: 2024 - Q3
Celene Campbell - $14500 - 2/16/21, CA
Install
Sales- Greg Jamroz
Turn- Ralph Ortiz
Horizontal furnace, coil, A/C
Total - $14,500.00 (Wells Fargo 48 months/no interest)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 10000 - 15000
- Date Ranges
- Date Ranges: 2021 - Q1
Dave/Diane Stephens - $2500 - 1/14/20, CA
Intake modification
Sales- Greg Jamroz
Turn- N/A
Total- $2,500.00 (Collect full amount - Greg did not specify payment type)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2020 - Q1
Jerad Chao - $1390 - 7/2/25, CA
Installation **PER GREG; PLEASE BRING A 2X2 PIECE OF PLYWOOD IN THE ATTIC. THERE IS ONE SECTION ON THE PLATFORM BETWEEN THE FURNACES THAT BOWS AND IS NOT STURDY. **ROOFER SCHEDULED 1PM
Sales- Greg
Turn- Pablo
U/S- 5TON horizontal R802VA furnace/coil in attic, BOVB18 A/C.D/S - Phenomenal Air
Total due - $22,000.00 *Synchrony 18 months*
Installation
Sales- Greg
Turn- N/AD/S - 5TON Horizontal R802VA furnace/coil, BOVB18 A/C
Total due - $22,000.00 *Synchrony 1 year*
Per Nick -Whole house angle stops, At water main needs gate valve replaced with ball valve 1 1/4"Need to reset toilet with new wax ring Customer is H/O GC: #2672 PLEASE COLLECT TBDCustomer wanted to adjust angle stops per NICK we can adjust invoice onsite. Meeting with Jared, please call when on the way 805-630-1870
Sales: KevinInstallation of Flagship 1465 whole home filtration system, removing sediment, chlorine, and contaminants for large homes or commercial use.
Location: garage
Tasks:
Preparation:
1. Shut off main water supply to home.
2. Identify installation point near main water line (1-1/2-inch pipe recommended).
3. Clear area for 14-inch x 65-inch tank and control valve access.
System Installation:
1. Cut into main water line and install 1-1/2-inch inlet/outlet fittings.
2. Position 1465 tank on stable base, ensuring level alignment.
3. Connect control valve to tank and plumbing with copper or PEX piping.
4. Fill tank with filtration media (e.g., activated carbon, KDF).
5. Install bypass valve for maintenance.
Testing and Adjustment:
1. Turn on water supply and check for leaks at all connections.
2. Program control valve for backwash cycle (12-18 GPM flow rate).
3. Run initial backwash to flush media and verify flow (up to 13 GPM service rate). Will need to run discharge line under ground into area drain by saw cutting concrete walk way and tapping into area drain. This is a must to avoid further damage to you’re concrete walk way.
Cleanup and Final Steps:
1. Wipe down tank and piping to remove debris or water.
2. Dispose of packaging per local regulations.
3. Conduct client walkthrough to explain operation, backwash schedule, and maintenance.Financing: $3,583/Paying $6,392.08 CC
Confirmed with Jared 805-630-1870 who will be on site 05/30, 8-9
- Plumbing
- Plumbing: Plumbing Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2025 - Q3
- Date Ranges: 2025 - Q2
- HVAC
- HVAC: HVAC Install
- Price Ranges: 20001 - 25000
- Date Ranges: 2024 - Q2
Customer Testimonials
There are no testimonials at this time. Check back later!