Conejo Services - Internal Map
We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559
Our Work
Gary Nesen - $37998 - 8/22/22, CA
Install **THIS IS A TWO DAY-INSTALLATION
Sales- Brice
Turn- N/A
Friday- UPSTAIRS Horizontal R802VA furnace, coil, BOVB18 A/C, CleanEffects
Monday- DOWNSTAIRS R802VA Horizontal furnace, coil, BOVB18 A/C, CleanEffects
Financing - $35,350.00 *Synchrony 18 months
Amex - $2,648.00
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 35001 - 40000
- Date Ranges
- Date Ranges: 2022 - Q3
Emily and Colin Scibetta - $8850 - 2/7/20, CA
Install ***PLEASE NOTE; GREG IS UPGRADING HOMEOWNER TO ECO BEE THERMOSTATS (2 OF THEM). A/C WILL BE INSTALLED AT A LATER DATE.. UPGRADING TO 20-SEER.
Sales- Greg
Turn- N/A
Horizontal R802VA furnace, coil, line set ducting (approx 7 runs)
Returning a later date to install A/C (after sidewalk is finished)
Total - $22,500.00 (Financing; Synchrony 18 months/no interest)
Install **YOU WILL BE PICKING UP EQUIPMENT FROM LENNOX PARTS PLUS IN OXNARD ON THE WAY TO YOUR INSTALLATION. ADDRESS: 2221 Eastman Ave, Oxnard, CA 93030**
Sales- Mike McFarlane
Turn- N/A
Upflow furnace, coil, A/C
Total - $8,850.00 (CC or check, sales did not specify)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2020 - Q1
- Price Ranges: 20001 - 25000
- Date Ranges: 2022 - Q1
Rick Franklin Jr. - $1150 - 6/20/24, CA
Install **Ryan a Ferguson's told Bobby the EQ wouldn't be in until 12, and that they would have to deliver to jobsite. Tried to expedite EQ.
Sales- Greg Jamroz
Turn- N/A,
U/S - horizontal air handler and heat pump, ducting.
D/S - horizontal air handler (relocate to attic), heat pump, ducting, zoning.
Financing - $49,000.00 (Wells Fargo 18 months no interest)
COLLECT CHECK: $1,000.00
Installation
Sales- Brice
Turn- Dakota
Cutting 3 supplies, cutting in filter frame, adding zone to existing zone system.
Total - $4,900.00 (Collect CC or check)
Install comfort pump**PUMP IS ON THE SHELF**
Sold by Rob
**UPON COMPLETION, PLEASE COLLECT $1,150.00**GATED RANCH BUT GATES WILL OPEN**
Please call when on the way 805-501-3219
Rough in back to back toilets
Sold by Art
1 full day
2 techs
**UPON COMPLETION, PLEASE COLLECT $3,123.13**
Please call when on the way 805-501-3219
- Plumbing
- Plumbing: Plumbing Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2024 - Q2
- HVAC
- HVAC: HVAC Install
- Date Ranges: 2023 - Q3
- Price Ranges: 45001 - 50000
- Date Ranges: 2020 - Q2
Bob and Francis Perry - $8400 - 4/25/23, CA
Installation **TWO DAY PROJECT 8/30 + 8/31 (HOLDING A SPOT 9/7 IN CASE THERE IS MORE DUCTWORK TO FINISH)
Sales- Greg
Turn- Jesse Murillo
U/S 4TON horizontal S8V2 furnace, coil, XR15 A/C ducting 15 runs.
D/S 4TON horizontal S8V2 furnace, coil, XR15 A/C ducting 5 runs.
WEDNESDAY 8/30 REPLACE UPSTAIRS EQUIPMENT, AND DOWNSTAIRS DUCTING (OR HOWEVER YOU SEE FIT; UPSTAIRS EQUIPMENT/SYSTEM MUST BE IN WORKING ORDER FIRST.THURSDAY, REMAINDER OF WORK.
Total - $45,800.00 (Greg has CC)
Tankless replacement**PLEASE COLLECT $8,400.00 UPON COMPLETION**
Please call Bob when you are on your way 805-371-7446
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2023 - Q2
- Price Ranges: 45001 - 50000
- Date Ranges: 2023 - Q3
Bob Ruffinen - $13510 - 8/14/23, CA
Installation *Pre 7am
Sales- Greg
Turn- Aflredo
U/S - 3TON Upflow S8X1 furnace/coil in attic, XR14 A/C, change 1-2 ducts runs.
Total due - $13,510.00 (CC or check; homeowner to decide)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 10000 - 15000
- Date Ranges
- Date Ranges: 2023 - Q3
Customer Testimonials
There are no testimonials at this time. Check back later!