Conejo Services - Internal Map
We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559
Our Work
James and Gladys Crippa - $7300 - 6/4/24, CA
Install
Sales- Greg
Turn- Nathan
5TON Horizontal R802VA furnace, coil, BOVB18 A/C, 18 supplies/4 returns, Honeywell #T6, CleanEffects*Plumbing will handle tank to tankless. Electricians will handle surge protector.Deposit - $1,000.00 (Visa)
Total due for this portion - $34,000.00 (Check)
Install
Sales- Greg
Turn- Nathan
Converting tank to NRCR111 w/pump**PLEASE CONFIRM IF FLASHING NEEDS TO BE DONE**
Total for this portion - $7,300.00 *HVAC will collect full check*
- Plumbing
- Plumbing: Water Heater Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2024 - Q2
- HVAC
- HVAC: HVAC Install
- Price Ranges: 30001 - 35000
Jennifer Culverson - $10500 - 2/18/20, CA
Install
Sales- Greg Jamroz
Turn- Georgie Fimbres
Upflow furnace, coil, A/C
Total- $10,500.00 *Customer is financing - Wells Fargo 12 months/no interest
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 10000 - 15000
- Date Ranges
- Date Ranges: 2020 - Q1
Henry and Rochelle Wallach, CA
Install
Sales- Brice
Turn- N/A
Zoning
*Customer needed this dateMUST CALL ON YOUR WAYDeposit - $450.00 (check)
Total - $4,050.00 (CC or check)*Bobby will be onsite in the afternoon
**THIS IS A MULTIPLE DAY PROJECT. **EQUIPMENT/INSULATION MUST BE REMOVED THROUGH HOLES IN CEILING THAT STATEWIDE ROOFING HAS CUT. PLEASE ASK BOBBY IF YOU HAVE ANY QUESTIONS
Sales- Brice
Turn- N/A
8/1- HVAC removal + insulation removal
8/2-8/3 Insulation removal (Removing approx. 3,140 sq. ft. of BATT insulation (THROUGH ROOF HOLE THAT WAS CUT). + Performing air seal (Or perform air seal when we return for new insulation)
8/4-8/5 Installing of new HVAC (Horizontal B6H96 furnace/coil, BOVB18 condenser 15 runs, new return, CleanEffectts
8/8-8/9 Installing of new insulation: Performing Air Seal (if was not done during removal) Approximately 3,140 sq. ft. of BATT (OPEN) insulation, 16 inch bays), and R19 (FACED) on vaulted walls. Brice did NOT put sq. footage of vaulted walls.
Total - $49,826.00 (CC or check; homeowner to decide)
Remodel-customer supplied fixtures in 3 separate bathrooms.**CUSTOMER IS REQUESTING THAT WE'RE PACKED UP AND OUT OF THE HOUSE AT 4:00 EACH DAY**Sold by Nick3 Days
**UPON COMPLETION, PLEASE COLLECT $8,087.50**
Please call when on the way 805-217-7176
Garbage disposal/snake kitchen line**PLEASE TAKE A SHOWER HEAD**Sold by Nick
**UPON COMPLETION, PLEASE COLLECT $1,060.00**
Please call when on the way 805-217-7176
Install 75-gallon water heater, re-build manifold for existing recirculation pump per Nick's estimate
Customer is H/O
Not Gated
Please collect $4,750.
Call when on the way (805) 217-7176
Please call customer 30 minutes prior arrival
- Roofing
- Plumbing
- Plumbing: Plumbing Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2024 - Q4
- Date Ranges: 2024 - Q3
- Plumbing: Water Heater Install
- Date Ranges: 2022 - Q2
- HVAC
- HVAC: HVAC Install
- Price Ranges: 45001 - 50000
- Date Ranges: 2022 - Q3
- Date Ranges: 2022 - Q4
Jeanine Liss - $4200 - 3/24/20, CA
INSTALL
Sales- Greg Jamroz
Turn- N/A
Installing tankless *No water heater currently*
Total to collect: $4,200.00 (Per Greg - PREFER check, if not, then CC)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2020 - Q1
Geoffrey Davies - $13600 - 10/3/22, CA
Install **CRANE ARRIVAL 10:00; WILLINGHAM CRANE **PLEASE HAVE HOMEOWNER SIGN WELLS FARGO FORM; THEY KEEP BOTTOM COPY. PLEASE BRING TOP COPY BACK TO OFFICE
Sales- Greg
Turn- John
Upflow S8X1 furnace, coil, XR14 A/C
Total - $13,600.00 *Financing; Wells Fargo 18 months no interest*
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 10000 - 15000
- Date Ranges
- Date Ranges: 2022 - Q4
Customer Testimonials
There are no testimonials at this time. Check back later!