Conejo Services - Internal Map
We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559
Our Work
Hossein Izadpanah, CA
Installation
Sales- Chip
Turn- Eric
5TON Horizontal R802VA furnace/coil in attic, BOVA15 A/C, zone board (replacing existing),
Total due - $19,000.00 (Collect CC or check; sales did not specify)
**NOTE; THIS IS BOOKED FOR A DAY AND A HALF, IF YOU DO NOT NEED THE HALF DAY, LET CANDICE KNOW.Sales- OwenPanel upgrade to 200amp + 1. Replace exhaust fan in laundry room with new Panasonic whisper fan.
2. Replace 7 detectors in total, 4 smoke detectors and 3 combo detectors.
3. Rework garbage disposal and dishwasher outlet by installing 2 gang cut in box.
4. Install 2 gfi outlets under the sink.Total due - $7,669.00 (CC or CHECK)
- Electrical
- Electrical: Panel Upgrade Install
- Date Ranges
- Date Ranges: 2026 - Q1
- Price Ranges
- Price Ranges: -10000
- HVAC
- HVAC: HVAC Install
- Price Ranges: 15001 - 20000
- Date Ranges: 2024 - Q2
Patricia Gomez - $6800 - 2/2/24, CA
Installation
Sales- Greg
Turn- Dakota
3TON Upflow R801CA furnace
Deposit - $680.00 (check)
Total due - $6,120.00 (Luz to call customer in 1-2 weeks; pulling check from reverse mortgage).
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2024 - Q1
Diane Chuning - $14200 - 5/28/24, CA
Installation
Sales- Greg
Turn- Dakota
4TON Upflow S8X1 furnace, coil in attic, XR14 A/C, Honeywell #T6
Total due - $14,200.00 *Wells Fargo 18 months*
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 10000 - 15000
- Date Ranges
- Date Ranges: 2024 - Q2
2700 Mar Vista Ridge Drive, CA
**THIS IS A 2-DAY PROJECT/WORKING WITH LOCAL ROOFS.
12/12/22 Removing package unit/roof top ductwork.
12/14/22 re-install rooftop ductwork. and Prepared space for removal and replacement of return air plenum, intake grille.Installed new return duct and grille, install new return air plenum, properly insulated and sized for system capacity.
TOTAL TO HOMEOWNER - $2,400.00 (cc OR CHECK)
- Roofing
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2022 - Q4
Susan Condon - $7750 - 10/6/23, CA
Install
Sales- Greg
Turn- Parker
5TON XR14 AC only
Total due - $7,750.00 (AMEX)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2023 - Q4
Customer Testimonials
There are no testimonials at this time. Check back later!