Take a look at our past work!

Conejo Services - Internal Map

We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559

The company performs work related to -10000, HVAC Install, HVAC, Price Ranges, Date Ranges

Our Work

Celene Campbell - $14500 - 2/16/21, CA

Install

Sales- Greg Jamroz

Turn- Ralph Ortiz

Horizontal furnace, coil, A/C

Total - $14,500.00 (Wells Fargo 48 months/no interest)

  • HVAC
  • HVAC: HVAC Install
  • Price Ranges
  • Price Ranges: 10000 - 15000
  • Date Ranges
  • Date Ranges: 2021 - Q1
Dave/Diane Stephens - $2500 - 1/14/20, CA

Intake modification

Sales- Greg Jamroz

Turn- N/A

Total- $2,500.00 (Collect full amount - Greg did not specify payment type)

  • HVAC
  • HVAC: HVAC Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2020 - Q1
Jerad Chao, CA

Installation **PER GREG; PLEASE BRING A 2X2 PIECE OF PLYWOOD IN THE ATTIC. THERE IS ONE SECTION ON THE PLATFORM BETWEEN THE FURNACES THAT BOWS AND IS NOT STURDY. **ROOFER SCHEDULED 1PM

Sales- Greg

Turn- Pablo

U/S- 5TON horizontal R802VA furnace/coil in attic, BOVB18 A/C.D/S - Phenomenal Air 

Total due - $22,000.00 *Synchrony 18 months*


Installation

Sales- Greg

Turn- N/AD/S - 5TON Horizontal R802VA furnace/coil, BOVB18 A/C

Total due - $22,000.00 *Synchrony 1 year*

Per Nick -Whole house angle stops, At water main needs gate valve replaced with ball valve 1 1/4"Need to reset toilet with new wax ring Customer is H/O GC: #2672 PLEASE COLLECT TBDCustomer wanted to adjust angle stops per NICK we can adjust invoice onsite. Meeting with Jared, please call when on the way 805-630-1870

Sales: KevinInstallation of Flagship 1465 whole home filtration system, removing sediment, chlorine, and contaminants for large homes or commercial use.


Location: garage


Tasks:

Preparation:

1. Shut off main water supply to home.

2. Identify installation point near main water line (1-1/2-inch pipe recommended).

3. Clear area for 14-inch x 65-inch tank and control valve access.


System Installation:

1. Cut into main water line and install 1-1/2-inch inlet/outlet fittings.

2. Position 1465 tank on stable base, ensuring level alignment.

3. Connect control valve to tank and plumbing with copper or PEX piping.

4. Fill tank with filtration media (e.g., activated carbon, KDF).

5. Install bypass valve for maintenance.


Testing and Adjustment:

1. Turn on water supply and check for leaks at all connections.

2. Program control valve for backwash cycle (12-18 GPM flow rate).

3. Run initial backwash to flush media and verify flow (up to 13 GPM service rate). Will need to run discharge line under ground into area drain by saw cutting concrete walk way and tapping into area drain. This is a must to avoid further damage to you’re concrete walk way.


Cleanup and Final Steps:

1. Wipe down tank and piping to remove debris or water.

2. Dispose of packaging per local regulations.

3. Conduct client walkthrough to explain operation, backwash schedule, and maintenance.Financing: $3,583/Paying $6,392.08 CC

Confirmed with Jared 805-630-1870 who will be on site 05/30, 8-9

2527 Brickfield Court

Westlake Village, CA 91362Remove Solar 1/27Reinstall Solar TBDGate Code #2672SRS is here loading the roof Bryan has one guy here working waiting for inspection there’s going to be more guys tomorrow.

Spoke to Jerad he was finally home today he said everything seems to be going well. The guys are installing felt and setting tile on front of house

Looks like they will finish on Monday there’s still a bit to be done there’s 5 guys working

Talked to Brayan’s guys they said they will not finish today or tomorrow due to needing more tile.

  • Roofing
  • Roofing: Re-Roofing
  • Date Ranges
  • Date Ranges: 2026 - Q1
  • Price Ranges
  • Price Ranges: 40001 - 45000
  • Plumbing
  • Plumbing: Plumbing Install
  • Price Ranges: -10000
  • Date Ranges: 2025 - Q3
  • Date Ranges: 2025 - Q2
  • HVAC
  • HVAC: HVAC Install
  • Price Ranges: 20001 - 25000
  • Date Ranges: 2024 - Q2
Jeff And Maria Menton - $14440 - 1/25/24, CA

Installation

Sales- Greg

Turn- David M

HVAC - 4TON Upflow R802VA furnace, coil.

PLUMBING - Replacement of 50 gallon water heater.

Total due - $14,440.00 *Synchrony 18 months*

  • HVAC
  • HVAC: HVAC Install
  • Price Ranges
  • Price Ranges: 10000 - 15000
  • Date Ranges
  • Date Ranges: 2024 - Q1
Wendy Snyder - $4275 - 7/7/21, CA

Install

Sales- Brandon

Turn- N/A

Converting tank to tankless (EZ50)

Total - $4,275.00 (CC or check)

  • HVAC
  • HVAC: HVAC Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2021 - Q3

Customer Testimonials

There are no testimonials at this time. Check back later!