Conejo Services - Internal Map
We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559
Our Work
Andrea Green - $18650 - 12/30/24, CA
Installation **CRANE ARRIVAL 9:30-10:00AM; DANNY'S CRANE
Sales- Greg
Turn- Parker
HVAC- 5TON Horiz R95 furnace, coil, rooftop BOVA15 A/C, Honeywell #T6ELEC- Install light and switch in attic. Line is ran to box near attic access.
Deposit - $1,000.00 (Visa)
Total due - $17,650.00 (Visa)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 15001 - 20000
- Date Ranges
- Date Ranges: 2024 - Q4
Jeff Lozito - $6500 - 8/10/22, CA
Install
Sales- Chippendale
Turn- Jorge Lechuga
Upflow coil (D/S)
$4,600.00 (CC)
Install
Sales- Brandon
Turn- N/A
XR-14 A/C (downstairs)
Total - $6,500.00 (CC or check)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2022 - Q3
Julie Holzhauser - $14000 - 12/31/24, CA
Installation
Sales- Greg
Turn- Parker
U/S - 4TON Horizontal R801T furnace, coil, BOVA15 A/c
Deposit - $1,000.00 (MC)
Total due - $13,000.00 (Ask homeowner how they would like to pay)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 10000 - 15000
- Date Ranges
- Date Ranges: 2024 - Q4
Rick and Lou Ann Lemmo - $3111.2 - 11/8/24, CA
Install
Sales- Greg
Turn- N/A
U/S- 3TON horiz. S8X1 furnace/coil in attic, BOVA15 heat pump, NEST thermostatD/S- 4TON horiz. S8X1 furnace/coil in attic, BOVA15 heat pump,
Total due - $29,952.00 *WF 18 months*
Replace powder room toilet and master toilet and Install. 1 1/4” regulator. ( over 120psi)Sold by Bill
**UPON COMPLETION, PLEASE COLLECT $2,805.40**
Please call when on the way 805-469-2258
- Plumbing
- Plumbing: Plumbing Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2024 - Q4
- HVAC
- HVAC: HVAC Install
- Price Ranges: 25001 - 30000
- Date Ranges: 2024 - Q2
Tim and Peg Tressel, CA
Installation **7AM PRE
Sales- Greg
Turn- Dakota
4TON horizontal R802VA furnace/coil in attic, BOVB18 A/C, (3) Honeywell #T6,
Duct mod (going from 4 zones to 3), duct mod (3) ducts off plenum.
Total - $19,360.00 *Greg has CC on contract*
Sales - Stacie
Scope of work:
Expose drain line for toilet in hallway bathroom upstairs by cutting into drywall in the garage ceiling. Shut off water at toilet. Drain toilet of water and remove toilet from the ground. Replace closet flange, adjust to proper height, and strap into place. Install new mounting hardware and wax ring. Remount toilet. Seal around base of toilet with caulking. Test for leaks. 1 year warranty on scope of work.
Replacement of up to 10 ft of 3 inch cast iron piping in drywall ceiling of garage.
Conejo services is not responsible for any drywall repairs or finished painting.
Collect: CC or Check $4150
- Plumbing
- Plumbing: Plumbing Install
- Date Ranges
- Date Ranges: 2026 - Q1
- Price Ranges
- Price Ranges: -10000
- HVAC
- HVAC: HVAC Install
- Price Ranges: 15001 - 20000
- Date Ranges: 2023 - Q4
Customer Testimonials
There are no testimonials at this time. Check back later!