Lisa Woolf-Field - $17600 - 12/28/21, CA
Install
Sales- Greg
Turn- N/A
U/S- Horizontal R802VA furnace/coil, BOVB18 A/C.
*No longer swapping systems; will perform duct modifications/new ductwork.
Deposit - $1,000.00 (Visa)
Total due - $16,600.00 (Ask homeowner if she would like to use same Visa, or a different form of payment; per Greg)
**PLEASE BRING BACK PORTABLE HEATER TO CVHA-SHOP
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 15001 - 20000
- Date Ranges
- Date Ranges: 2021 - Q4
Bill Woody and Jennifer Pond - $18300 - 6/4/20, CA
Install
Sales- Greg Jamroz
Turn- Alfredo Orozco
Upflow furnace, coil, A/C, ducting.
Total- $18,300.00 *Financing - Wells Fargo 18 months/no interest*
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 15001 - 20000
- Date Ranges
- Date Ranges: 2020 - Q2
Shekman Wong - $16889 - 4/17/25, CA
Installation
Sales- Brice
Turn- Dakota
4TON Upflow R802VA furnace, coil, RA14 A/C. Relocate A/C to other side of garage main door, NUVE thermostatVacant.LOCKBOX: #1950
Total due - $16,889.00 *Collect by CC; accounting to call*
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 15001 - 20000
- Date Ranges
- Date Ranges: 2025 - Q2
Marsha Wolinsky - $2863.2 - 5/12/25, CA
Installation **7AM PRE
Sales- Greg
Turn- parker
4TOn horiz SL280V furnace/coil, BOVA15 A/C,
Total due - $17,500.00 (Wells Fargo 18 months*
Sales: NickScope of work
- saw cut concrete in pool equipment area first to minimize energy from jack hammer
- demo section of concrete
- excavate earth to expose leak
- once piping has been exposed, turn water on to visually confirm leak
- shut water off and drain down system
* shut off located in side yard, controls water to irrigation system in back yard, house is not affected
- cut out section of piping containing leak(s)
- clean/prep pipe ends
- rebuild section in rigid copper pipe and fittings
- allow glue to cure prior to pressure test
- turn water on and inspect for leaks
- backfill excavated area with washed sand to protect piping
* any riser penetrating concrete will be wrapped in 20 mil tape
- rough patch of concrete
- clean up work area once job is complete
* if leak is underneath brick work then same process will be repeated in 2nd marked area. Conejo does not replace brick work, will give referral to licensed contractor if needed
Collect: $2,863.20
Confirmed with Marsha 818-469-1976 who will be on site 05/12, 9-11
- Plumbing
- Plumbing: Plumbing Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2025 - Q2
- HVAC
- HVAC: HVAC Install
- Price Ranges: 15001 - 20000
- Date Ranges: 2024 - Q3
Mike and Amy Wolfram - $14900 - 8/1/22, CA
Install
Sales- Greg
Turn- David
Horizontal S8X1 furnace, coil, XR16 slim-line A/C
Deposit - $1,000.00 (Visa)
Total due- $13,900.00 (Visa)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 10000 - 15000
- Date Ranges
- Date Ranges: 2022 - Q3
Customer Testimonials