Take a look at our past work!

Conejo Services - Internal Map

We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559

The company performs work related to -10000, HVAC Install, Date Ranges, HVAC, Price Ranges

Our Work

Kennedy Rose - $6970 - 12/13/24, CA

Install *TWO DAY PROJECT; 1/23 + 1/24

Sales- Owen

Dedicated EV charger circuit.

Panel upgrade, 200a-200a

Total due - 8,329.00

Sales- DerekSewer Spot RepairTotal to collect - $6,970.00 (CC OR CHECK)

12/20/24: IN ADDITION TO:

Install [3] Customer supplied TOTO toilets w/ new wax rings and supply lines

D/S bathroom closet flange will need to be repaired prior to D/S toilet installation

**AMOUNT TO COLLECT WHEN COMPLETED: $1,529.00


Return to complete/repair the work from the previous job:

Excavate the sewer line approximately 6’ deep. Will dig a 4’x6’x7’ hole under a large bush for access to the pipe. Will clear away roots from the pipe, cut out the broken fittings, and replace with new. Will test for leaks and proper flow. Will backfill the hole.


IN ADDITION TO:


Install [3] Customer supplied TOTO toilets w/ new wax rings and supply lines

D/S bathroom closet flange will need to be repaired prior to D/S toilet installation

**AMOUNT TO COLLECT WHEN COMPLETED: $1,529.00


Pease call Kennedy when on the way 805-807-9915

Installation

Sales- Greg

Turn- N/A3TON Upflow R802VA furnace, coil, BOVA15 A/C, (2) Honeywell #9000, ducting 7 runsDeposit - $1,000.00 (CC)

Total due - $24,800.00 (Accounting to call H/O)

  • Plumbing
  • Plumbing: Plumbing Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2024 - Q4
  • HVAC
  • HVAC: HVAC Install
  • Price Ranges: 25001 - 30000
  • Electrical
  • Electrical: Panel Upgrade Install
  • Date Ranges: 2025 - Q1
David and Yvonne Thomas - $4860 - 11/20/24, CA

Install

Sales- Greg

Turn-Panel upgrade; 100a-200a same location.

Total due- $7,500.00 (CC or check)

Install 50 Gallon Water Heater and Irrigation RepairSold by Paul

**UPON COMPLETION, PLEASE COLLECT CHECK FOR $31,778.00**

Please call when on the way 805-427-6315

Installation Sales- Greg Turn- ParkerHVAC- 4TON Upflow SL280V furnace, coil, add on BOVB18 A/C, ducting 10 runs.ELEC- Run new #8 wire for A/C to panel. Approx 15'. Returning to install new panel when approved by Edison.Deposit - $1,000.00 (check)

Total due - $26,300.00 (check)

  • Plumbing
  • Plumbing: Water Heater Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2024 - Q4
  • HVAC
  • HVAC: HVAC Install
  • Price Ranges: 25001 - 30000
  • Electrical
  • Electrical: Panel Upgrade Install
John Coons - $8200 - 2/10/25, CA

Sales - Owen

100 amp to 125 amp panel upgrade, future mini split circuit, and future car charger circuit.

Total due - $8,100.00

  • Electrical
  • Electrical: Panel Upgrade Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2025 - Q1
Gloria Granados - $12500 - 9/13/24, CA

Installation

Sales- Greg

Turn- Nathan4TON BOVB18 A/C and coilTotal due - $12,500.00

Panel Upgrade. 100 amp to 200 amp. Same Location. 36" minimum.Total due - $7,500.00

  • HVAC
  • HVAC: HVAC Install
  • Price Ranges
  • Price Ranges: 10000 - 15000
  • Date Ranges
  • Date Ranges: 2024 - Q3
  • Electrical
  • Electrical: Panel Upgrade Install
  • Price Ranges: -10000
  • Date Ranges: 2024 - Q4
Darrell Manginelli - $6995 - 9/20/24, CA

Install

Sales- Owen

Panel upgrade, 100a - 200a.

Total due - $6,380.00

Sales- JesseTurn- OwenRemove approx 1,800 sq. ft. of BATT insulation.Install approx 1,800 sq. ft. of blown-in insulation to R38 valueTotal due - $6,995.00 (Ask homeowner if he would like to use Visa on contract)

  • Insulation
  • Insulation: Insulation Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2024 - Q3
  • Electrical
  • Electrical: Panel Upgrade Install
  • Date Ranges: 2024 - Q4

Customer Testimonials

There are no testimonials at this time. Check back later!