Take a look at our past work!

Conejo Services - Internal Map

We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559

The company performs work related to -10000, HVAC, HVAC Install, Date Ranges, Price Ranges

Our Work

Alexa and John Soldo - $7399.17 - 9/8/25, CA

Install

Sales- Matt Carpenter

Turn- N/APanel upgrade; 100a-200a

Total due - $5,800.00

Sales: JustinInstall new flagship 1252 water filtration system into water service located in exterior closet.

Filtration system will be installed on ground next to door. Water service is located in same closet.


Flagship water filtration system will reduce scale buildup in plumbing system preventing premature failure of piping and plumbing fixtures while providing safe clean drinking water to entire house.


This system will filter entire guest house domestic water.


Install new flagship 1252 filtration system.

Install new unistrut mounting system.

Install new earthquake strapping.

Install new copper piping to and from filter. Install copper discharge piping with hose adapter fitting.

Collect: $7,399.17 / Check

Confirmed with Alexa 281-435-3772 who will be on site 09/08

BBQ gas line and Fireplace gas line Sold by Nick3 DAYS

**UPON COMPLETION, PLEASE COLLECT $8,820.00**

Please call when on the way 805-729-3534

  • Plumbing
  • Plumbing: Plumbing Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2025 - Q3
  • Date Ranges: 2024 - Q3
  • Electrical
  • Electrical: Panel Upgrade Install
Geoffrey Sharp - $8000 - 10/8/24, CA

Panel upgrade. **TWO DAY PROJECT 10/7 + 10/8

Sales- Owen

Upgrade panel 100a to 200a; and relocate.

Total due - $8,000.00

  • Electrical
  • Electrical: Panel Upgrade Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2024 - Q4
Ruth Martin - $5000 - 7/16/24, CA

Install

Sales- Cruz

Turn- N/A

Replace existing sub-panel like for like

Total to collect - $5,000.00 (collect CC)

  • Electrical
  • Electrical: Panel Upgrade Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2024 - Q3
Yuan Dorsett - $6000 - 9/10/24, CA

Panel Upgrade

Sales- Owen100a to 200a; underground.

Total due - $6,000.00

  • Electrical
  • Electrical: Panel Upgrade Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2024 - Q3
Mary Ann Johnen - $3600 - 6/13/24, CA

Install

Sales- Chip

Turn-

Panel upgrade

Insulation **TWO DAY PROJECT; UNLESS SELVIN FINISHES IN ONE DAY

Sales- Chip

Turn- N/A

Removing approx 900 sq. ft. of blown-in.

Installing approx. 900 sq. ft. of blown-in. tp R-38 value.Total for this portion - $3,600.00 (check)

Installation

Sales- Chip

Turn- N/A

3TON Upflow R802VA furnace, coil, BOVA15 A/C, 5 runs, Honeywell #T6Total for this portion - $22,260.00 (Collect check)

  • Insulation
  • Insulation: Insulation Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2024 - Q2
  • HVAC
  • HVAC: HVAC Install
  • Price Ranges: 20001 - 25000
  • Electrical
  • Electrical: Panel Upgrade Install

Customer Testimonials

There are no testimonials at this time. Check back later!