Conejo Services - Internal Map
We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559
Our Work
Maggie Reed - $17750 - 7/9/25, CA
Install
Sales- Greg Jamroz
Panel upgrade, 100-200a, underground.
Total due - $7,500.00 (COLLECT CHECK)
Installation
Sales- Greg
Turn- Eric
4TON upflow R802VA furnace/coil, Innovair 18-seer slim-line A/C, NUVE thermostat
Total for this portion - $17,750.00 (Collet check for $10,000.00. She needs a few days to give us $7,750.00 balance)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 15001 - 20000
- Date Ranges
- Date Ranges: 2025 - Q3
- Electrical
- Electrical: Panel Upgrade Install
- Price Ranges: -10000
Matt and Kimberly Germaine - $8800 - 7/16/25, CA
Panel upgrade.
Sales- Alex200a-200a, currently ran underground.
Total due - $6,300.00 (CC or check)
Installation
Sales- Greg
Turn- Parker
5TON Innovair slim-line A/C
Total due - $8,300.00 (CHECK)
Sales: Jimmyreroute kitchen line through exterior of home up to main sewer in front yard 40 feet.
Scope of work includes the following:
Saw cut, jack hammer, and excavate from in back of kitchen sink to properly gain access to original material to allow to reconfigure line to exterior of home.
Once kitchen line is reconfigured, we will remove concrete on left side of home to give us access for kitchen reroute.
After side of home has been excavated, we will dig in planter in front yard and attempt to excavate under sidewalk and up to main sewer in front of home using 2 inch PVC material.
After scope for work has been performed, we will backfill and compact soil properly.Collect: $8,800.00
Confirmed with customer while on site 07/15-07/17
Conejo home services will excavate at exit of home 3 feet in depth and an additional hole 8 feet at property line to allow trench Less operator to perform trench-less replacement using high density polyethylene material.
Dig a 4x4x3 square in front of house to expose 4” orange berg coming out from house. Also dig another 4x4x9’ square in front of house in front yard where the 4x4” transition pipe is located. Start the pipe burst job by installing a winch and a pipe busting head attachment to pull a new HDPE pipe in to the old one from the hole closes to the house out to the side walk. The old pipe is broken and the new one takes its place. Install a new 2 way clean out and connect pipe on section closes to house. Also reconnect new pipe to transition pipe out on grass area. Backfill clean up job site.
Conejo home services cannot be held responsible for any type of flooring, concrete, drywall, stucco, landscaping, existing plumbing fixtures, or structure to home.Collect: $11,985.00 + $8,800.00 = $20,785.00
- Plumbing
- Plumbing: Plumbing Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2025 - Q3
- Price Ranges: 10000 - 15000
- HVAC
- HVAC: HVAC Install
- Date Ranges: 2025 - Q2
- Electrical
- Electrical: Panel Upgrade Install
Susan Gunther - $17260 - 10/4/24, CA
Install
Sales- Brice
Turn-
Panel upgrade; 100amp to 200amp
Total due - $6,700.00
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 15001 - 20000
- Date Ranges
- Date Ranges: 2024 - Q4
- Electrical
- Electrical: Panel Upgrade Install
- Price Ranges: -10000
Larry and Martha Trulock - $3345 - 4/26/24, CA
Install
Sales- Sean Haworth
Panel upgrade from 125 to 200 (derating down to 125, per Edison)Total due - $7,229.40 (CC or check; homeowner to decide)
Install 50 gallon tank water heater
Sold by Derek
**UPON COMPLETION, PLEASE COLLECT $3,345.00**HE SAID PULL IN THE DRIVEWAY**
Please call when on the way 805-484-9836
- Plumbing
- Plumbing: Water Heater Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2024 - Q2
- Electrical
- Electrical: Panel Upgrade Install
John and Joann Locascio - $7355.6 - 11/29/24, CA
Sales- Owen
Panel upgrade; 200a-200a; underground.
Total due - 6,880.00
Install
Sales- Greg Jamroz
Turn- N/A
Upflow furnace, coil, a/c
Deposit: $1,000.00 (amex)
Total due: $12,000.00 (amex)
Whole Flagship 1354 carbon filtration, Angle stops, Toilet rebuild **THE CUSTOMER WANTS US THERE AT 9:00**Sold by Paul
**UPON COMPLETION, PLEASE COLLECT $7,355.60**
Please call John when on the way 805-217-5554
- Plumbing
- Plumbing: Plumbing Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2024 - Q4
- HVAC
- HVAC: HVAC Install
- Price Ranges: 10000 - 15000
- Date Ranges: 2020 - Q4
- Electrical
- Electrical: Panel Upgrade Install
- Date Ranges: 2025 - Q1
Customer Testimonials
There are no testimonials at this time. Check back later!