Take a look at our past work!

Conejo Services - Internal Map

We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559

The company performs work related to -10000, Date Ranges, HVAC, Price Ranges, HVAC Install

Our Work

Pete Kozak - $16800 - 1/2/25, CA

Install

Sales- Greg

Panel Upgrade100a-200a with 26 inch riser., plus running 240v from panel to A/C (this was not done on day of install).

Total due - $9,200.00


Installation

Sales- Greg

Turn- N/A4TON Add on XR15 slim line A/C, coil, Honeywell #T6

Deposit - $1,000.00 COLLECT - $15,800.00 (CC or check)

*Power will be ran day that panel upgrade is scheduled. Waiting on Edison for Meter Spot approval. Remaining balance to be collected then.

  • HVAC
  • HVAC: HVAC Install
  • Price Ranges
  • Price Ranges: 15001 - 20000
  • Date Ranges
  • Date Ranges: 2025 - Q1
  • Electrical
  • Electrical: Panel Upgrade Install
  • Price Ranges: -10000
Diane Humphrey - $3345 - 5/7/24, CA

Sales- Owen

Panel upgrade: 200amp-200amp

Total due - $6,880.00


Install ***MUST HAVE HOMEOWNER SIGN WELLS FARGO FORM PRIOR TO WORK BEGINNING. HOMEOWNER KEEPS BOTTOM COPY; PLEASE BRING TOP COPY BACK TO OFFICE.

Sales- James deVos

Turn- N/A

Ducting

Total- $3,850.00 *Customer IS financing. Wells Fargo 6 months/no interest*

Install 50 gallon water heater with code upgrades

Sold by Rob


**UPON COMPLETION, PLEASE COLLECT $3,345.00**


Please call when on the way 805-231-0937

  • Plumbing
  • Plumbing: Water Heater Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2024 - Q2
  • HVAC
  • HVAC: HVAC Install
  • Date Ranges: 2020 - Q1
  • Electrical
  • Electrical: Panel Upgrade Install
  • Date Ranges: 2025 - Q1
Brandon Highland - $6880 - 2/18/25, CA

Sales- PavelPanel upgrade, 100a-200a; same location.Total due - $6,880.00

  • Electrical
  • Electrical: Panel Upgrade Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2025 - Q1
Pat And Ellen Henahan - $35500 - 5/12/25, CA

Install

Sales- Dylan

Panel upgrade, 100a to 200a in same location.

Total due - $6,200.00


Installation

Sales- Greg

Turn- ParkerU/S - 4TON Horiz R802VA furnace/coil, BOVA15 A/C, NUVE thermostat, Secondary drainD/S - 4TON Horiz R802VA furnace/coil, BOVA15 A/C, NUVE thermostat, Secondary drainTotal due - $35,500.00 (CC)GATE CODE: #8521

  • HVAC
  • HVAC: HVAC Install
  • Price Ranges
  • Price Ranges: 35001 - 40000
  • Date Ranges
  • Date Ranges: 2025 - Q2
  • Electrical
  • Electrical: Panel Upgrade Install
  • Price Ranges: -10000
  • Date Ranges: 2024 - Q3
Tom Hare - $4355 - 8/19/25, CA

Install (ELECTRICAL PORTION 8/11-8/13,

Sales- Greg Jamroz

24KW Generator

Total for this portion - $23,500.00 (CC or CHECK)*Plumbing portion set for 8/14 + 8/15

Installation

Sales- Greg

Turn- N/A3TON Upflow R802VA furnace, coil, Innovair 18-slim A/C, ducting 10 runs, registers, return grill, NUVE (EASY MODE)Total due - $24,940.00 (CALL TOM; MAY KEEP ON VISA, OR DO CHECK)

  • Plumbing
  • Plumbing: Plumbing Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2025 - Q3
  • HVAC
  • HVAC: HVAC Install
  • Price Ranges: 20001 - 25000
  • Electrical
  • Electrical: Generator Install

Customer Testimonials

There are no testimonials at this time. Check back later!