Bernadette Bolton - $1680 - 10/5/20, CA
**TWO DAY PROJECT; 5/19 + 5/20
Sales- Owen
Home re-wire, and panel upgrade from 100a - 200amp (surface mounted)
Total due - 6,888.52 (cc OR CHECK)
Sales- Brandon Chippendale
Turn- N/A
Perform pump down on system and relocate condenser to front of house.
Re-use existing electrical under house, disconnect box, and condenser pad.
Install new filter line drier and pull vacuum on lines.
System will be test run and monitored for 15 minutes to assure that maximum efficiency levels are met.
Total - $1,680.00 (CC or check)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2020 - Q4
- Electrical
- Electrical: Electrical Install
- Date Ranges: 2025 - Q2
Joe D'Amico, CA
Misc. Electrical Repairs
Sold by Matt2 techs4 hrs.
**UPON COMPLETION, PLEASE COLLECT $1,050.00**
Please call when on the way 805-479-6101
3" Mainline Spot Repair
Sold by Leon
**UPON COMPLETION, PLEASE COLLECT $1,900.00**
Please call when on the way 805-479-6101
Install
Sales- Greg Jamroz
Turn- N/A
Upflow furnace, coil, A/C, ducting (approx 8 runs)
Total - $20,390.00 (CC or check)
Sales-Jimmy11/4- Mo and Ricardo to go back to back fill holes and area after final inspection
Conejo home services or excavate 3 feet at exit of home and additional 6 foot hole and property line to allow trench less operator to perform pipe bursting method using trenches technology.
We will have to excavate under footing 2 feet to remove root section connect PVC material and add a 4 inch two way clean out.
Add new wax ring for toilet
Once scope of work has been performed. We will backfill and compact soil properly.
Dig a 4x4x3 square in front of house to expose 4” orange berg material coming out from house. Also dig another 4x4x7’ square in front of house in grass area where the 4x6” transition pipe is located. Start the pipe burst job by installing a winch and a pipe busting head attachment to pull a new HDPE pipe in to the old one from the hole closes to the house out to the side walk. The old pipe is broken and the new one takes its place. Install a new 2 way clean out and connect pipe on section closes to house. Also reconnect new pipe to transition pipe out on grass area. Backfill clean up job site.
Job includes a 25 year warranty on parts and laborCollect cc or check $11500.00American will be used for pull 10/15 9am-10am
- HVAC
- HVAC: Plumbing Install
- Price Ranges
- Price Ranges: 10000 - 15000
- Date Ranges
- Date Ranges: 2112 - Q4
- HVAC: HVAC Install
- Price Ranges: -10000
- Date Ranges: 2023 - Q4
- Price Ranges: 20001 - 25000
- Date Ranges: 2020 - Q3
- Electrical
- Electrical: Electrical Install
- Date Ranges: 2024 - Q4
Oren Osouski Contractor, CA
Run power from sub panel to electric water heater
Sold by Nick
**UPON COMPLETION, PLEASE COLLECT $1,500.00**
Please call when on the way 818-216-4727
Gas reroute with shut off valveSold by Derek
**UPON COMPLETION, PLEASE COLLECT $3,200.00**
Please call when on the way 818-216-4727
Install electric water heater
Sold by Nick
**UPON COMPLETION, PLEASE COLLECT $3,135.00**
Please call Virginia 818-216-4727**GUARD AT THE GATE**
Install
Sales- Greg
Turn- Ryan
U/S - Upflow XV-80 furnace, coil, XR-16 A/C
D/S - Upflow XV-80 furnace, coil, XR-16 A/C
Deposit - $1,000.00 (check)
Collect check - $37,950.00
Install **ELECTRICAL PORTION, 11/19, 11/24, + 12/1 ****DO NOT SHUT POWER DOWN ON MONDAY 11/24/25!!!! VERY IMPORTANT
Sales- Greg Huber/Matt48KW Generator
11/19/25- SETTING OF GENERATOR.
**CRANE ARRIVAL, 9:30AM; DANNY'S CRANE11/24 + 11/25 - Remainder of electrical work.
BALANCE DUE FOR THIS PORTION - $33,200.00**NOTE; CLIENT TO GIVE A $15,000.00 PROGRESS PAYMENT ON 11/19/25.
Install **PLUMBING PORTIONSales- Greg Huber/Matt CarpenterTurn- N/A48KW Generator -
11/25/25 - RUN GAS LINES - DO NOT SHUT GAS OFF TO HOUSE AND DO NOT CONNECT TO METER. VERY IMPORTANT
12/1/25 - RETURN TO CONNECT TO HOUSE/METER, AND PUT ON GAUGE/TEST
Total for this portion - $6,500.00 (CC or check)
- Plumbing
- Plumbing: Generator Install
- Price Ranges
- Price Ranges: 35001 - 40000
- Date Ranges
- Date Ranges: 2301 - Q4
- Plumbing: Plumbing Install
- Price Ranges: -10000
- Date Ranges: 2288 - Q4
- Date Ranges: 2024 - Q3
- Plumbing: Water Heater Install
- Date Ranges: 2024 - Q2
- HVAC
- HVAC: HVAC Install
- Date Ranges: 2022 - Q2
- Electrical
- Electrical: Electrical Install
Christopher Troy - $11798 - 6/25/25, CA
Run 220/#8 wire from panel to A/C location approx. 30'-40'ft. *OK to cut lock off panel door.
Total for this portion - $1,200.00 (CC)
Installation
Sales- Brice
Turn- N/A3TON Add on Innovair 18-seer BOX A/C, upflow coil
Total for this portion - $11,798.00 (CC)**OK to cut off lock from main panel.
Lock box next to garage: 0211
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 10000 - 15000
- Date Ranges
- Date Ranges: 2025 - Q2
- Electrical
- Electrical: Electrical Install
- Price Ranges: -10000
Tina Firestein - $3075 - 5/15/24, CA
Install new whole house surge protector.
HVAC was installed Monday, insulation will be onsite same time-frame.
Total for this portion - $2,100.00 (Luz to collect; Service Finance)
Installation **PRE 7AM **WAITING ON PRE FOR SYSTEM SIZING
Sales- Jesse Cruz
Turn- Dan
5TON Upflow ML180E furnace, coil, BOVA15 A/C, relocate A/C, whole house surge protector, line set, electrical, Honeywell #T6
Total for this project - $
Insulation portion
HVAC installed Monday.Install approx 1,200 sq. ft. of blown-in insulation over existing.Total for this portion - $3,075.00
- Insulation
- Insulation: Insulation Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2024 - Q2
- HVAC
- HVAC: HVAC Install
- Price Ranges: 10000 - 15000
- Electrical
- Electrical: Electrical Install