Mark Beck - $5925 - 6/18/25, CA
Install
Sales- Owen
Turn- N/A125 sub panel + panel upgrade
Total for this portion- 5,925.00
- Electrical
- Electrical: Panel Upgrade Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2025 - Q2
Hamid Hashemi - $6100 - 4/21/25, CA
Install
Sales- Owen
Turn- N/A
Panel upgrade; 100a-200a
Total due - $6,100.00 (CC or chck)
- Electrical
- Electrical: Panel Upgrade Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2025 - Q2
Chris Ardalan - $6380 - 3/18/25, CA
Install
Sales- Owen
Turn- N/AUpgrade panel 100a - 200a; underground fed
Total due- $6,380.00
- Electrical
- Electrical: Panel Upgrade Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2025 - Q1
Kennedy Rose - $6970 - 12/13/24, CA
Install *TWO DAY PROJECT; 1/23 + 1/24
Sales- Owen
Dedicated EV charger circuit.
Panel upgrade, 200a-200a
Total due - 8,329.00
Sales- DerekSewer Spot RepairTotal to collect - $6,970.00 (CC OR CHECK)
12/20/24: IN ADDITION TO:
Install [3] Customer supplied TOTO toilets w/ new wax rings and supply lines
D/S bathroom closet flange will need to be repaired prior to D/S toilet installation
**AMOUNT TO COLLECT WHEN COMPLETED: $1,529.00
Return to complete/repair the work from the previous job:
Excavate the sewer line approximately 6’ deep. Will dig a 4’x6’x7’ hole under a large bush for access to the pipe. Will clear away roots from the pipe, cut out the broken fittings, and replace with new. Will test for leaks and proper flow. Will backfill the hole.
IN ADDITION TO:
Install [3] Customer supplied TOTO toilets w/ new wax rings and supply lines
D/S bathroom closet flange will need to be repaired prior to D/S toilet installation
**AMOUNT TO COLLECT WHEN COMPLETED: $1,529.00
Pease call Kennedy when on the way 805-807-9915
Installation
Sales- Greg
Turn- N/A3TON Upflow R802VA furnace, coil, BOVA15 A/C, (2) Honeywell #9000, ducting 7 runsDeposit - $1,000.00 (CC)
Total due - $24,800.00 (Accounting to call H/O)
- Plumbing
- Plumbing: Plumbing Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2024 - Q4
- HVAC
- HVAC: HVAC Install
- Price Ranges: 25001 - 30000
- Electrical
- Electrical: Panel Upgrade Install
- Date Ranges: 2025 - Q1
David and Yvonne Thomas - $4860 - 11/20/24, CA
Install
Sales- Greg
Turn-Panel upgrade; 100a-200a same location.
Total due- $7,500.00 (CC or check)
Install 50 Gallon Water Heater and Irrigation RepairSold by Paul
**UPON COMPLETION, PLEASE COLLECT CHECK FOR $31,778.00**
Please call when on the way 805-427-6315
Installation Sales- Greg Turn- ParkerHVAC- 4TON Upflow SL280V furnace, coil, add on BOVB18 A/C, ducting 10 runs.ELEC- Run new #8 wire for A/C to panel. Approx 15'. Returning to install new panel when approved by Edison.Deposit - $1,000.00 (check)
Total due - $26,300.00 (check)
- Plumbing
- Plumbing: Water Heater Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2024 - Q4
- HVAC
- HVAC: HVAC Install
- Price Ranges: 25001 - 30000
- Electrical
- Electrical: Panel Upgrade Install