Conejo Services - Internal Map
We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559
Our Work
Dan and Emily Brent - $6500 - 8/27/25, CA
Install **ELECTRICAL PORTION; 8/22, 8/25-826Sales- OWENTurn- N/A26KW GeneratorTotal for this portion - $24,700.44 (CC or CHECK)
Tankless WH flush, install 2 gallon expansion tank, Ground tankless, install 1" EQ valve and bracket, replace hose bib, install new 60" stainless washing machine hoses.
Sold by Bill
**UPON COMPLETION, PLEASE COLLECT $2,283.67**
Please call when on the way 818-266-3136
Install **PLUMBING PORTION Sales- Owen26KW GeneratorTotal for this portion - $6,500.00 (CC OR CHECK)**NOTE: David handled trenching.
- Plumbing
- Plumbing: Plumbing Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2025 - Q3
- HVAC
- HVAC: HVAC Install
- Date Ranges: 2024 - Q1
- Electrical
- Electrical: Electrical Install
- Price Ranges: 20001 - 25000
Patricia Olivares - $19210 - 3/19/24, CA
HVAC will be onsite. Running power to new A/C condenser.Installing/upgraded new electrical panel.NOTE: Per Edison; panel must be 10 feet to the right of the current one.
Install **NOTE; WILL BE INSTALLING A/C AT OPTION ONE. VERY IMPORTANT!!!
Sales- Jesse Cruz
Turn- N/A
3TON add on Bryant MURA38 A/C, horizontal EL196E furnace/coil under home.
Electricians will be onsite running power/upgrading panelFull total of project - $25,910.00 *Service finance; 9.99% for 120 months*
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 15001 - 20000
- Date Ranges
- Date Ranges: 2024 - Q1
- Electrical
- Electrical: Electrical Install
- Price Ranges: -10000
David and Angela Nichols - $17228 - 6/23/25, CA
Run #10 to A/C location. Ghost line from panel into attic. Run electrical down the wall in new line set cover. Approx. 60'-80'.
Total for this portion - $1,200.00 (CC or check)
***NO PRE PERFORMED
Install ***WILL BE USING FURNACE FROM SHOP. #R801CA050314MXA
Sales- Kevin
Turn- Georgie Fimbres
Horizontal R801CA furnace (in garage)
Total - $5,850.00 (CC; tenant situation)
Installation
Sales- Chip
Turn- N/A
3TON horiz. coil, add on Innovair 24-slim line A/C, ducting 8 runs.*Electrical to handle power.
Total for this portion - $17,228.00 (CC or check)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 15001 - 20000
- Date Ranges
- Date Ranges: 2025 - Q2
- Price Ranges: -10000
- Date Ranges: 2021 - Q4
- Electrical
- Electrical: Electrical Install
Bernadette Bolton - $1680 - 10/5/20, CA
**TWO DAY PROJECT; 5/19 + 5/20
Sales- Owen
Home re-wire, and panel upgrade from 100a - 200amp (surface mounted)
Total due - 6,888.52 (cc OR CHECK)
Sales- Brandon Chippendale
Turn- N/A
Perform pump down on system and relocate condenser to front of house.
Re-use existing electrical under house, disconnect box, and condenser pad.
Install new filter line drier and pull vacuum on lines.
System will be test run and monitored for 15 minutes to assure that maximum efficiency levels are met.
Total - $1,680.00 (CC or check)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2020 - Q4
- Electrical
- Electrical: Electrical Install
- Date Ranges: 2025 - Q2
Joe D'Amico, CA
Misc. Electrical Repairs
Sold by Matt2 techs4 hrs.
**UPON COMPLETION, PLEASE COLLECT $1,050.00**
Please call when on the way 805-479-6101
3" Mainline Spot Repair
Sold by Leon
**UPON COMPLETION, PLEASE COLLECT $1,900.00**
Please call when on the way 805-479-6101
Install
Sales- Greg Jamroz
Turn- N/A
Upflow furnace, coil, A/C, ducting (approx 8 runs)
Total - $20,390.00 (CC or check)
Sales-Jimmy11/4- Mo and Ricardo to go back to back fill holes and area after final inspection
Conejo home services or excavate 3 feet at exit of home and additional 6 foot hole and property line to allow trench less operator to perform pipe bursting method using trenches technology.
We will have to excavate under footing 2 feet to remove root section connect PVC material and add a 4 inch two way clean out.
Add new wax ring for toilet
Once scope of work has been performed. We will backfill and compact soil properly.
Dig a 4x4x3 square in front of house to expose 4” orange berg material coming out from house. Also dig another 4x4x7’ square in front of house in grass area where the 4x6” transition pipe is located. Start the pipe burst job by installing a winch and a pipe busting head attachment to pull a new HDPE pipe in to the old one from the hole closes to the house out to the side walk. The old pipe is broken and the new one takes its place. Install a new 2 way clean out and connect pipe on section closes to house. Also reconnect new pipe to transition pipe out on grass area. Backfill clean up job site.
Job includes a 25 year warranty on parts and laborCollect cc or check $11500.00American will be used for pull 10/15 9am-10am
- Date Ranges
- Date Ranges: 2025 - Q4
- HVAC
- Price Ranges
- Price Ranges: 10000 - 15000
- HVAC: HVAC Install
- Price Ranges: -10000
- Date Ranges: 2023 - Q4
- Price Ranges: 20001 - 25000
- Date Ranges: 2020 - Q3
- Electrical
- Electrical: Electrical Install
- Date Ranges: 2024 - Q4
Customer Testimonials
There are no testimonials at this time. Check back later!