Conejo Services - Internal Map
We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559
Our Work
Oren Osouski Contractor, CA
Run power from sub panel to electric water heater
Sold by Nick
**UPON COMPLETION, PLEASE COLLECT $1,500.00**
Please call when on the way 818-216-4727
Gas reroute with shut off valveSold by Derek
**UPON COMPLETION, PLEASE COLLECT $3,200.00**
Please call when on the way 818-216-4727
Install electric water heater
Sold by Nick
**UPON COMPLETION, PLEASE COLLECT $3,135.00**
Please call Virginia 818-216-4727**GUARD AT THE GATE**
Install
Sales- Greg
Turn- Ryan
U/S - Upflow XV-80 furnace, coil, XR-16 A/C
D/S - Upflow XV-80 furnace, coil, XR-16 A/C
Deposit - $1,000.00 (check)
Collect check - $37,950.00
Install **ELECTRICAL PORTION, 11/19, 11/24, + 12/1 ****DO NOT SHUT POWER DOWN ON MONDAY 11/24/25!!!! VERY IMPORTANT
Sales- Greg Huber/Matt48KW Generator
11/19/25- SETTING OF GENERATOR.
**CRANE ARRIVAL, 9:30AM; DANNY'S CRANE11/24 + 11/25 - Remainder of electrical work.
BALANCE DUE FOR THIS PORTION - $33,200.00**NOTE; CLIENT TO GIVE A $15,000.00 PROGRESS PAYMENT ON 11/19/25.
Install **PLUMBING PORTIONSales- Greg Huber/Matt CarpenterTurn- N/A48KW Generator -
11/25/25 - RUN GAS LINES - DO NOT SHUT GAS OFF TO HOUSE AND DO NOT CONNECT TO METER. VERY IMPORTANT
12/1/25 - RETURN TO CONNECT TO HOUSE/METER, AND PUT ON GAUGE/TEST
Total for this portion - $6,500.00 (CC or check)
- Date Ranges
- Date Ranges: 2025 - Q4
- Plumbing
- Price Ranges
- Price Ranges: 35001 - 40000
- Plumbing: Plumbing Install
- Price Ranges: -10000
- Date Ranges: 2024 - Q3
- Plumbing: Water Heater Install
- Date Ranges: 2024 - Q2
- HVAC
- HVAC: HVAC Install
- Date Ranges: 2022 - Q2
- Electrical
- Electrical: Electrical Install
Christopher Troy - $11798 - 6/25/25, CA
Run 220/#8 wire from panel to A/C location approx. 30'-40'ft. *OK to cut lock off panel door.
Total for this portion - $1,200.00 (CC)
Installation
Sales- Brice
Turn- N/A3TON Add on Innovair 18-seer BOX A/C, upflow coil
Total for this portion - $11,798.00 (CC)**OK to cut off lock from main panel.
Lock box next to garage: 0211
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 10000 - 15000
- Date Ranges
- Date Ranges: 2025 - Q2
- Electrical
- Electrical: Electrical Install
- Price Ranges: -10000
Tina Firestein - $3075 - 5/15/24, CA
Install new whole house surge protector.
HVAC was installed Monday, insulation will be onsite same time-frame.
Total for this portion - $2,100.00 (Luz to collect; Service Finance)
Installation **PRE 7AM **WAITING ON PRE FOR SYSTEM SIZING
Sales- Jesse Cruz
Turn- Dan
5TON Upflow ML180E furnace, coil, BOVA15 A/C, relocate A/C, whole house surge protector, line set, electrical, Honeywell #T6
Total for this project - $
Insulation portion
HVAC installed Monday.Install approx 1,200 sq. ft. of blown-in insulation over existing.Total for this portion - $3,075.00
- Insulation
- Insulation: Insulation Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2024 - Q2
- HVAC
- HVAC: HVAC Install
- Price Ranges: 10000 - 15000
- Electrical
- Electrical: Electrical Install
Robert and Caitlin Martin - $17000 - 4/12/24, CA
Run new 220/#8 wire from panel to new A/C location.
Run electrical INSIDE garage. Path of conduit specific.
Per Greg Jamroz and Customer; do NOT use any existing conduit.
Approx. 30'
Total for this job - $1,500.00 *Synchrony 18 months*
Installation **PRE 7AM
Sales- Greg
Turn- Jesse Murrilo
4TON Upflow R802VA furnace, coil, BOVA15.
Electric will run power.Total due - $17,000.00 *Synchrony 18 months*
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: 15001 - 20000
- Date Ranges
- Date Ranges: 2024 - Q2
- Electrical
- Electrical: Electrical Install
- Price Ranges: -10000
Blair Allan, CA
Per Sean-
Returning to finish install;Pull wire, setting transfer switch, and wiring panels.
Install
Sales- Greg
Turn- Craig
MBR system- horizontal coil and XR-14 condenser.
Total - $10,500.00 (Per Greg; CC or check, homeowner will decide)
Installation
Sales- Greg
Turn- Eric
D/S- 3TON horiz BGH96 furnace/coil, BOVB18 A/C, CleanEffects
Total due - $23,000.00 (Check or CC)
Sales: NickSCOPE OF WORK (California Plumbing Codes (CPC) included for reference):
• Installation of new tankless water heater.
• Installation of 2” or 3” PVC exhaust vent to an approved location (CPC 701 - 705/503.2 & 503.3)
• Installation of a new shut off valve on the cold water line (CPC 606.2)
• Installation of isolation valves on the tankless water heater for future servicing.
• Installation of new 3/4” dielectric stainless steel flexible connectors on the cold & hot water lines.
• Insulate up to 5ft of the cold & hot water lines (150 (J) 2)
• Installation of a thermal expansion tank (CPC 608.2 & 3)
• Installation of electrical bonding clamps on the cold water line, hot water line & gas line, connecting all 3 using 6 gauge copper wire to aid in the prevention of electrolysis (250-104 a,b)
• Installation of uni-strut; mounting the tankless water heater to the proposed location
• Installation of pressure relief valve with a 3/4” copper drain line ran to an approved location (CPC 608.5)
• Installation of a new 3/4” gas shut off valve, gas sediment trap & 3/4” x 24” flexible gas connector to water heater (CPC 702/1212.9)
• Installation of a condensate neutralizer (CPC 307)
• Installation of a 3/4” PVC condensate drain line to an approved location (CPC 307)
• Installation of Noritz control panel at water heaters location for future diagnostic purposes.
• Cover existing water heater stand w/ sheet metal & corner caps (if applicable).Collect: $5,000.00
Confirmed with Blair 805-914-8018 who will be on site 09/04, PM
Main water 2” backflow device installation.
Sold by Andrew
**Please call when on the way 805-914-8018
Install Everpure chiller and insta hot, pick up counter weight from JC.
Sold by Nick
**UPON COMPLETION, PLEASE COLLECT $1,543.80**
Please call when on the way 805-914-8018
Sales: AndrewLeft side of driveway irrigation repairExcavate 2 leaking 1” in-line irrigation control valves and remove in ground boxes. Replace with new irrigation control valves, shut off valves, and 17x30 in ground box.
Excavate 1.5” irrigation water main and reconfigure to above ground location in copper with new ball valve shutoff and hose bib tying back into existing in-ground regulator.Collect: $5,240.00
Confirmed with Blair who will be on site 01/21
Scope per Matt-Run new cat 6E direct burial cables and a pull string approx. 400 ft. for security cameras.Matt to add cost later.
- Date Ranges
- Date Ranges: 2025 - Q4
- Plumbing
- Price Ranges
- Price Ranges: -10000
- Plumbing: Plumbing Install
- Date Ranges: 2024 - Q2
- Date Ranges: 2025 - Q1
- HVAC
- HVAC: HVAC Install
- Date Ranges: 2024 - Q1
- Plumbing: Water Heater Install
- Date Ranges: 2025 - Q3
- Price Ranges: 20001 - 25000
- Date Ranges: 2025 - Q2
- Price Ranges: 10000 - 15000
- Date Ranges: 2021 - Q3
- Electrical
- Electrical: Electrical Install
- Price Ranges: 100000+
- Date Ranges: 2024 - Q3
Customer Testimonials
There are no testimonials at this time. Check back later!