Take a look at our past work!

Conejo Services - Internal Map

We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559

The company performs work related to Price Ranges, Date Ranges, -10000, HVAC Install, HVAC

Our Work

Kris Thabit, CA

Installation **CRANE 10:00AM; WILLINGHAM CRANE **VIP CLIENT

Sales- Greg

Turn- N/A

Horizontal R802VA furnace/coil, BOVA15 (rooftop), ducting 14 runs, zoning (x2), (2) NUVE thermostats, CleanEffects, all new supply registers, + 2 new return grills.

Total due - $34,770.00 *ACCT TO CALL MONDAY***LOCK BOX: 2025 (FRONT DOOR)

  • Plumbing
  • Plumbing: HVAC Install
  • Price Ranges
  • Price Ranges: 30001 - 35000
  • Date Ranges
  • Date Ranges: 2335 - Q4
Michelle Perez, CA

Sales- JimmyToilet Install (Customer Supplied), toilet seat, wax ring, and supply and test for proper operation.

CC or check $1215.00

  • Plumbing
  • Plumbing: Plumbing Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2334 - Q4
Ted Peratis, CA

3950 Tarrytown Lane Agoura Hills 30sq Resetsmoke sent 12/2Met with the inspector he said the nailing was good but the material for the valleys wasn’t said it was ok to go ahead with the flat areas but wants pictures of the new material. Also wants a listed tested assembly for the fire place.Met with Ted made sure he’s happy with the install he’s happy with everything so far the front side of the garage still needs to be finished also they still need to finish the lower roof and the rake tiles.he said that the bird stop was supposed to be black but it looks to be cinnamon color.Guys are cleaning up all material has been loaded up

  • Plumbing
  • Plumbing: Roofing
  • Price Ranges
  • Price Ranges: 25001 - 30000
  • Date Ranges
  • Date Ranges: 2333 - Q4
James Thibo, CA

1613 Brentford Avenue Westlake Village 31sq Reset

Smoke and Carbon emailed 11/1412/1: Tear off12/2: Materials/Insp6 guys working today looks like they should be finished today most of the rake is done and there working on the mortar.They finished the roof today everything looks good except there are about four shiners in the eaves that Samuel will get in the morning

  • Plumbing
  • Plumbing: Roofing
  • Price Ranges
  • Price Ranges: 25001 - 30000
  • Date Ranges
  • Date Ranges: 2332 - Q4
Margaret Wall, CA

Installation **DO NOT CONNECT WIFI ON THERMOSTATS; HOOK UP IN MANUAL MODE!!!

Sales- Chip

Turn- Jesse Murillo

MASTER - 4TON horizontal Goodman single-stage FAU/coil, NUVE thermostat.SECOND SYSTEM - 4TON horizontal Goodman single-stage FAU ONLY NUVE thermostat.

Total due $18,306.00 (CHECK)

  • Plumbing
  • Plumbing: HVAC Install
  • Price Ranges
  • Price Ranges: 15001 - 20000
  • Date Ranges
  • Date Ranges: 2330 - Q4

Customer Testimonials

There are no testimonials at this time. Check back later!