Sales: NickScope of work :
- shut water off to back flow ( located in side yard )
- excavate around irrigation box
- remove irrigation box
- cut out existing manifold
- clean/prep pipe ends
- rebuild manifold with all brass body valves
- allow glue to cure prior to pressure testing
- turn water back on and pressure test for leaks
- test sprinkler to ensure proper operation
- clean up work area once job is complete Collect: $3,043.12
Confirmed with Dan 310-922-2500 who will be on site 08/01
Sales-StacieInstall a new pressure regulator and adjusted it to the proper pressure. - Reg - 1 1/2 Double Union
- ball valve
- hose bib
- relief valve
- pipe/fittings
* set incoming pressure to 75 psi
* 1 year warranty on parts/labor through Conejo
CC or check $2783.20
- Date Ranges
- Date Ranges: 2025 - Q4
- Plumbing
- Plumbing: Plumbing Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges: 2025 - Q3
13230 Red Bird Court,Moorpark, CA, US
Installation of a Noritz NRCR111 tankless gas water heater in a garage, replacing an existing tank unit, with built-in recirculation pump.Sold by: Derek
Location: Garage
Recirculation Pump: Yes (Built-in)
Tasks:Preparation and Shutoff:
1. Shut off gas supply valve
2. Turn off electrical breaker for GFCI outlet installation
3. Close main water supply
4. Drain existing tank water heater to empty tank
Removal of Existing Unit:1. Disconnect gas line from tank heater
2. Detach cold and hot water supply lines
3. Remove and dispose of old tank unit per local regulations
New Tankless Water Heater Installation:1. Position Noritz NRCR111 unit with adequate clearance per code
2. Install GFCI outlet by Conejo Electrician per NEC standards (120V, 15A minimum)
3. Connect new stainless steel water supply lines (cold and hot) to top-mounted connections
4. Install isolation valve kit on cold and hot water lines for flushing and servicing
5. Install 1/4-turn ball valve on cold water inlet
6. Install expansion tank, adjusted to home water pressure (typically 50-60 PSI)
7. Fit new gas shutoff valve on gas line
8. Attach new flexible gas supply line with sediment trap
9. Secure unit with wall-mounting brackets
10. Reconnect to existing T&P relief valve exit point
11. Install venting per Noritz specs (e.g., 3-inch up to 150 ft)
12. Configure built-in recirculation pump with return line per client needs
13. Insulate water supply and return lines for efficiency
14. Install copper bonding wire from water lines to gas line for grounding
Testing and Startup:1. Pressure-test gas and water connections for leaks
2. Fill system and purge air from lines
3. Test T&P relief valve operation
4. Turn on breaker for GFCI outlet and verify power to unit
5. Light pilot, set temperature to 120°F (or per client preference) via remote thermostat, and confirm burner ignition
6. Validate recirculation pump operation and full status (0.5-11.1 GPM flow, 18,000-199,900 BTU/h)
Cleanup and Final Steps:1. Clear debris from work area
2. Haul away old tank unit for disposal
3. Conduct final inspection with client walkthrough
CUSTOMER IS FINANCING FOR THIS JOB: APPROVED VIA LINK ON INCVOICE
GATE CODE: 0737Please call Maria (310) 383-2069
***Customer 19-year-old will be home at the time of install but is asking they we DO NOT RING DOORBELL, CUSTOMER HAS DOGS AND THEY WILL GO CRAZY. JUST ENTER THROUGH GARAGE DOOR (WILL BE OPEN
- Plumbing
- Plumbing: Plumbing Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2025 - Q3
Customer Reviews
There are no testimonials at this time. Check back later!