Conejo Services - Internal Map
We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559
Our Work
Morgan Scheelhaase, CA
Installation **TWO DAY PROJECT; 2/24 + 2/25
Sales- Jesse
Turn- N/A
5TON upflow R802VA furnace/coil, (Innovair SOV 16-eer A/C, and relocating AC to behind gate), ducting 14 runs, CleanEffects
Deposit- $1,000.00 (CC)
Total due - $28,960.00 (CC OR CHECK)
- HVAC
- HVAC: HVAC Install
- Date Ranges
- Date Ranges: 2026 - Q1
- Price Ranges
- Price Ranges: 25001 - 30000
Richard Levy, CA
Installation
Sales- Greg
Turn- N/A
3TON horizontal BVA15 air handler, BOVA15 heat pump, ducting 9 supplies/1 return.
Total due - $19,700.00 (HOMEOWNER WILL PAY CC AND CHECK)
- HVAC
- HVAC: HVAC Install
- Date Ranges
- Date Ranges: 2026 - Q1
- Price Ranges
- Price Ranges: 15001 - 20000
Karen Neiberg, CA
Installation
Sales- Greg
Turn- Ryan Peck/Sergio
D/S - 5TON upflow Goodman GR9S80 FAU
Total due - $6,300.00 (CC or CHECK)
Sales-Tony***NO POLY MATERIAL; GAS SLEEVE NSDR OR PVC AND WILL FISH WARD FLEX THROUGH THE SLEEVE***Project Summary
This project involves the interior trenching and installation of a new 3/4" polyethylene gas line system. The work requires precision cutting of existing wood flooring and cautious excavation of a post-tension concrete slab to facilitate the new line. Conejo Services will manage the transition from underground piping to existing galvanized fixtures, followed by backfilling and a rough concrete patch to restore the subfloor integrity.
Scope of Work
Demolition & Prep: Precision saw-cut wood flooring at designated areas to allow for trenching access.
Concrete Excavation: Jackhammer concrete over the post-tension slab to create a trench from marked locations inside the home.
Trenching: Excavate a trench to a depth of 18"–24" as required for gas line clearance.
Gas Line Installation: Supply and install a new 3/4" polyethylene gas line.
Risers & Connections: Install transition risers and connect the new line to existing exposed galvanized piping.
Protection: Sleeve the pipe appropriately and install tracer wire for future utility locating.
Restoration: Backfill the trench with original dirt and apply a rough patch concrete finish to the floor.
Exclusions
While Conejo Services provides a comprehensive rough-in, the following finish services are strictly excluded from this specific scope of work:
Flooring: Final repair, replacement, or refinishing of wood planks.
Drywall: Patching, sanding, or painting of walls or ceilings.
Baseboards: Removal, reinstallation, or painting of trim.
Cabinets: Removal, modification, or resetting of cabinetry.
Stucco: Any exterior wall repairs or finish matching.
Warranty Information
Conejo Services stands behind the quality of our craftsmanship and materials.
Coverage: 10-Year Parts and Labor Warranty.
Provider: All warranty claims are serviced directly through Conejo Services.
Disclaimers
Post-Tension Slab: While every precaution is taken during jackhammering, the homeowner acknowledges the inherent risks of working on a post-tension slab.
Dust & Debris: Concrete cutting and jackhammering are high-dust activities. While we use dust mitigation, some settlement is to be expected.
Matching: Rough concrete patching is intended for structural closure only and will not be a "finished" or decorative floor surface.
Existing Pipes: Conejo Services is not responsible for the integrity of existing galvanized piping beyond the point of new connection.
CC or Check $11533.00
- Plumbing
- Plumbing: Plumbing Install
- Date Ranges
- Date Ranges: 2026 - Q1
- Price Ranges
- Price Ranges: 10000 - 15000
- HVAC
- HVAC: HVAC Install
- Price Ranges: -10000
Douglas Johnson, CA
Installation
Sales- Chip
Turn- N/A
5TON upflow R801V furnace/coil, RD16 slim line A/C, NUVE thermostat, 4" Honeywell filter base, new line set
Total due - $15,858.00 (CHECK OR CC)
- HVAC
- HVAC: HVAC Install
- Date Ranges
- Date Ranges: 2026 - Q1
- Price Ranges
- Price Ranges: 15001 - 20000
Brian and Meghan Freeth, CA
Installation **FLASHING SET FOR 1PM; DAVID HANDYMAN
Sales- Greg
Turn- N/A
5TON horizontal R802VA furnace/coil, Innovair 16-seer box GOV60 A/C, FOCUS PRO tstat
Total due - $18,500.00 *ACCT TO CALL; CC OR CHECK*
- HVAC
- HVAC: HVAC Install
- Date Ranges
- Date Ranges: 2026 - Q1
- Price Ranges
- Price Ranges: 15001 - 20000
Customer Testimonials
There are no testimonials at this time. Check back later!