Conejo Services - Internal Map
We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559
Our Work
Lee and Jane Curtis, CA
Installation
Sales- Ralph/Craig
Turn- N/A
5TON horizontal R801 furnace/coil, Innovair 18-slim line, ECO-BE, duct sealing.
Total due - $19,200.00 (CC or CHECK)
- HVAC
- HVAC: HVAC Install
- Date Ranges
- Date Ranges: 2026 - Q1
- Price Ranges
- Price Ranges: 15001 - 20000
Karen Cohen, CA
Installation **PRE 7AM
Sales- Greg Jamroz
Turn- David G
4TON upflow GR9S80 furnace/coil, GLX14 AC, FOCUS PRO (if needed).
Total due - $13,9130 (Cient is paying Cashier's Check of $7,300.00 and the remainder of CASH)
- HVAC
- HVAC: HVAC Install
- Date Ranges
- Date Ranges: 2026 - Q1
- Price Ranges
- Price Ranges: 10000 - 15000
Jason Canton, CA
Installation **PRE 7AM **MUST GO SMOOTHLY. NO HICCUPS!
Sales- Greg Jamroz
Turn- N/A
3ton Upflow R802VA furnace, coil, Innovair 16-seer GOV36 A/C, move AC few inches, duct seal, CleanEffects, condensation pump.
Total due - $20,200.00 (CHECK OR CC; ACCT TO CALL)
- HVAC
- HVAC: HVAC Install
- Date Ranges
- Date Ranges: 2026 - Q1
- Price Ranges
- Price Ranges: 20001 - 25000
Phil Hamilton, CA
Sold by Omar G
Approved by Matt to by be put on Electrical Install
Scope of Work:Replace 4 - 4 foot fluorescent lights to led. Replace all the devices in right side of garage to ensure safety. Fix problem with the current outlets and lights.
Added - 2- 4ft fluorescent lights to LED. Add a dimmer for this 2 lights.
Change out all the old GE breakers, except the new solar ones and the main breaker. All the 15,20, and 30 amp breakers replaced with new. Re-paint deadfront with spray paint to match as much as possible to current color of panel. Relabel all the breakers with stickers.
Customer is H/O
Not Gated
Amount to collect: $3245.80 ($1650.60 + $1595.20)
Please call when you're on the way (805) 320-9064 Phil
- Electrical
- Electrical: Electrical Install
- Date Ranges
- Date Ranges: 2026 - Q1
- Price Ranges
- Price Ranges: -10000
James Pugliese, CA
****PLEASE TAKE PICTURE OF PANEL BEFORE BEGINNING AND UPLOAD/SEND TO CANDICE'S PHONE #805-279-1635. VERY VERY IMPORTANT!!!!Sales- OwenScope of work-
1. Pull power from existing outlet in garage cabinet.
2. Extend power with mc cable for 6 feet.
3. Install new outlet in garage at a lower height.
4. Use the new outlet to extend power directly behind it on the outside.
5. Install new gfi with bubble cover.
6. Mount low voltage transformer near new gfci outlet.
7. Run low voltage wire from the transformer to the first spotlight.
8. Each light down low will be triple hit, 1 wire will be running up the palm tree for tree light.
9. Install 4 spot lights illuminating down below.
10. Install 4 tree lights up in the palm trees.
11. Install 1 floodlight to illuminate the putting green.
Customer is supplying the 4 palm tree lights, conejo is supplying 300 watt transformer, 4 black spotlights, and 1 black floodlight.Total due - $2,920.00
- Electrical
- Electrical: Electrical Install
- Electrical: Panel Upgrade Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2026 - Q1
Customer Testimonials
There are no testimonials at this time. Check back later!