Conejo Services - Internal Map
We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559
Our Work
Larry Cohen, CA
Installation **10AM START TIME
Sales- Greg
Turn- David G.
Ducting 10 runs, and CleanEffects
Total for this portion - $10,974.00 *ACCOUNTING TO CALL NEXT WEEK AFTER INSULATION PERFORMED (11/7), CLIENT WILL GIVE CC FOR THE FULL AMOUNT.*
Insulation **10AM START TIME
Sales- Greg
Turn- David G
Install approx. 1,964 sq. ft. of R38 blown-in insulation over existing.
Total for this portion - $4,026.00 *ACCOUNTING TO CALL NEXT WEEK AFTER INSULATION PERFORMED (11/7), CLIENT WILL GIVE CC FOR THE FULL AMOUNT.*
- HVAC
- HVAC: Insulation Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2138 - Q4
- HVAC: HVAC Install
- Price Ranges: 10000 - 15000
- Date Ranges: 2111 - Q4
Adam Kerner, CA
Installation
Sales- Jesse Cruz
Turn- Jesse Murillo
4TON R801 horizontal furnace
Total due - $7,700.00 (CC)
- HVAC
- HVAC: HVAC Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2104 - Q4
Shama Taj, CA
Sales-Jimmy**PLEASE UPLPOAD TO ACCT OR SEND KRISTA PIC OF WATER HEATER LABEL**
Conejo home services will remove and replace 40 gallon of water heater with new 40 gallon Branford white unit up to code.
Drain and remove the old water heater.
Install a new 40 gallon water heater.
Install a new drain pan.
Sheetmetal the base.
Install a new gas flex connector, water connectors, supply ball valve shut-off and quake strap.
Install expansion tank at supply line of water.
Hook T&P valve up to existing copper line.
Tax and permits are included in the price of cost.
6 year tank 6 year parts and 1 year labor warrantyCollect CC or check $3195.00
- HVAC
- HVAC: Water Heater Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2101 - Q4
Tim and Cindy Gaul, CA
Misc. Plumbing Sold by StacieNEED TO BRING AND REPLACE PAN AS WELL PER NICK
Replacement of shower cartridge in master bathroom: $750
Replacement of hot and cold cartridges for bathtub faucet in master bathroom: $710
Replacement of fill valve for toilet in master bathroom as well as jack and Jill bathroom: $210Replacement of shower cartridge in upstairs guest bathroom: $373
Run snake through overflow for jack and Jill bathroom due to slow drain: $150
Replacement of emergency shut off valve under jack and Jill lav sinks 2 cold, 1 hot: $840 Conejo 1 year parts/labor warranty.Anything not listed in this estimate is not included in the price. If more work is necessary a change order will be given.Conejo does not warranty existing piping piping systems, only repairs or replacements made by conejo.Conejo does not repair or replace stucco, drywall, paint, or water damage nor are they included in this estimateAmount to collect when done $3,033.00
Please call 805-217-7374
- HVAC
- HVAC: Plumbing Install
- Price Ranges
- Price Ranges: -10000
- Date Ranges
- Date Ranges: 2100 - Q4
First Congregational Church of Long Beach, UCC, CA
Traffic Control Plan: We are going to have to do the post no parking tomorrow morning As far as the signage for the closure, we will set it up on Thursday morning.
9/19 - UPDATED / NEW SCHEDULE:□ 9/16: Enclose the scaffolding holes on the lower roof with torch down patches.□ 9/17: Obtain measurements for metal fabrication (copper flashing, edge metal, and gutters).□ 9/18 – 9/26: Fabricate copper flashing, edge metal, and gutters.□ 9/22: Tower roof & lower roof section tear off, tile stacking, wood replacement, and inspection completed.□ 9/23-9/29 (5 days): Install all copper (edge metal, gutter system, coping metal); install underlayment on both tower and lower roofs.□ 9/26: Load/offload materials w/crane and install the roof access hatch.□ 9/30-10/15 (12 days): Complete tile installation in both sections (tower & lower roof).□ 10/16-10/21 (4 days): Tower scaffolding removed by LocalRoofs down to the lower roof section (scaffolding remains from ground level up to the lower roof).□ 10/22-10/28 (5 days): LocalRoofs completes lower roof section by installing new ½” plywood as necessary to cover the openings (where scaffolding was installed over the footings), install 3-ply torch, and redo the 1st 2 courses of tile.□ 10/29-11/3 (4 days): Reroof completed and all remaining scaffolding removed by LocalRoofs.
9/5 - JB: I will get the anchors ordered. The hatch has been ordered and we are due to receive the hatch by 6/25. If the hatch arrives sooner I will advise. ready for Pick up in Santa Ana
9/9 Invoice has been paid and ordered: Best I can do for 3/4" X 600’ is $997.50ea.Approx. 2-3 business daysCody RobertsBC Wire Rope & Rigging2720 E. Regal Park DriveAnaheim, CA 92806PH: 714-666-8000 Ext. 138FX: 714-666-8200
9/10: Crane Reservations Email sent: Please note we began setting up scaffolding today, and anticipate needing the crane sometime around 9/24 – 9/25. We should know more as things progress, and will do our best to provide a week’s notice.
- HVAC
- HVAC: Roofing
- Price Ranges
- Price Ranges: 100000+
- Date Ranges
- Date Ranges: 2099 - Q4
Customer Testimonials
There are no testimonials at this time. Check back later!