Take a look at our past work!

Conejo Services - Internal Map

We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559

The company performs work related to Price Ranges, HVAC Install, Date Ranges, HVAC, -10000

Our Work

Kristin Guy, CA

Installation **TWO DAY PROJECT 10/31 + 11/3 ***IMPORTANT; FRIDAY START WITH DUCTING AND A/C... DO NOT DO FURNACE/COIL UNTIL MONDAY

Sales- Jesse

Turn- N/A

4TON Upflow S8V2 furnace, coil, BOVA15 A/C, ducting 10 runs, NUVE thermostat, CleanEffects

Deposit - $1,000.00 (CC)

Total due - $25,550.00 (CC OR CHECK; SEE IF CLIENT WANTS TO USE SAME CC AS DEPOSIT)

Sales-BillReroute 1/2 cold water line around the house for refrigerator feed

Shut water off to the houseCut and tie into the cold water hose bib line under kitchen window

Install a isolation valve at point of tie in

Run new 1/2” piping and shallow channel uni strut along the bottom of the house around the left corner of the house and in a clear spot run up the wall and into the attic. Approximately 30’.

From the attic, tie in with 1/2” pex. Run new pex line into the cabinet above the fridge. Approximately 15’. Install a new 1/4” quarter turn shut off. From the shut off run 1/4” blue tubing down and tie into the existing fridge line. Test and bleed system. Caulk around hole going into the attic.

CVHS provides a 1 year warranty on parts and labor

Customer to paint piping after we are done. Hold of on insulation

Pricing reflects courtesy discount for multiple jobs done at the same time

Install C/S Moen Shower Valve in U/S Guest Shower

Shut water off to house

Using customer supplied repair plate template. Open tile around existing valve

Cut out existing Delta shower valve

Install new Customer supplied Moen shower valve

Test and install new trim, tub spout and shower head

Seal up new trim

NOTE- No warranty on customer supplied materials

Pricing reflects courtesy discount per multiple jobs being done at the same time

Install C/S 1" Moen Flo (inside garage using softener loop)Shut water off to house and drain

Cut and rebuild 1” manifold to fit new 1” Moen Flo

Install new customer supplied Moen Flo

Test and take pics. Use existing electrical receptacle

Help customer set up app if necessary

NOTE- No warranty on customer supplied materials

Pricing replaces courtesy discount per multiple jobs being done at the same time

CC or Check: $2916.60

  • HVAC
  • HVAC: Insulation Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2110 - Q4
  • HVAC: HVAC Install
  • Price Ranges: 25001 - 30000
  • Date Ranges: 2107 - Q4
  • HVAC: Plumbing Install
  • Date Ranges: 2087 - Q4
PMP Management, CA
  • HVAC
  • HVAC: Roofing
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2086 - Q4
Johannes Peeters, CA

Sales-JohnDig around both leaking sprinkler valves and hose bib on back hill and cut out old valves. Glue onto existing pipe and raise, straighten out risers and install new brass body valves. Install new hose bib. Tie onto existing wires feeding valves and to sprinkler timer.

Cut out old sprinkler valve and 3/4 regulator on side hill and replace with new. Install new regulator on incoming side of new brass body sprinkler valve. CC or check $2357.90

  • HVAC
  • HVAC: Plumbing Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2085 - Q4
Bob Amirian, CA

Insp/Material load Thursday 10/23

Inspection signed off for nailing. Paper was delivered.

They just started putting down paper the morning 

Working on resetting tile

Brayan’s guys said they will be done tomorrow still setting tile and putting concrete on upper roof.

Guys are finishing up should be done in a couple of hours

  • HVAC
  • HVAC: Roofing
  • Price Ranges
  • Price Ranges: 20001 - 25000
  • Date Ranges
  • Date Ranges: 2082 - Q4
Renny Shapiro, CA

Installation

Sales- Chip

Turn- Eric

10/28 MAIN HOUSE -- 4TON R802VA Furnace and coil10/31 E - 4ton Innovair slim line A/C

TOTAL TO COLLECT 10/28 - $17,000.00

TOTAL TO BE COLLECTED PHASE TWO - $4,758.00


Per Eric

Replace control board for #3 system and 3 flame sensors

Parts Available - Manny's office


Customer's unit next to the new install is not working


Customer is H/O

Not Gated

Amount to collect: $1,357.60

Please call when you're on the way (310) 456-7304 Renny

KEEP ON ERIC

  • HVAC
  • HVAC: HVAC Install
  • Price Ranges
  • Price Ranges: -10000
  • Date Ranges
  • Date Ranges: 2083 - Q4
  • Price Ranges: 20001 - 25000
  • Date Ranges: 2081 - Q4

Customer Testimonials

There are no testimonials at this time. Check back later!