Conejo Services - Internal Map
We service the Ventura, Los Angeles, and Santa Barbara Counties and surrounding areas. Reach out to us if you’d like a consultation, (805) 232-5559
Our Work
Elizabeth Holman, CA
Shingle Color: Autumn
Customer would like January 5th
Material Same day mid day
Inspection Friday 1/9
- Date Ranges
- Date Ranges: 2026 - Q1
- Plumbing
- Plumbing: Plumbing Install
Pierre Sieux, CA
- Date Ranges
- Date Ranges: 2026 - Q1
- Plumbing
- Plumbing: HVAC Install
Greg And Susan Lay, CA
Sales-Kevin**Send Krista water heater label or upload to acct**40-Gallon Gas Water Heater Replacement
Replacement of an existing 40-gallon gas water heater in a garage with no recirculation pump.
Location: Garage
Recirculation Pump: No
Tasks:
Preparation and Shutoff:
1. Shut off gas supply valve
2. Close main water supply
3. Drain existing water heater to empty tank
Removal of Existing Unit:
1. Disconnect gas line from heater
2. Detach cold and hot water supply lines
3. Remove and dispose of old unit per local regulations
New Water Heater Installation:
1. Position new 40-gallon unit with adequate clearance per code
2. Install new drain pan beneath unit
3. Connect new stainless steel water supply lines (cold and hot)
4. Install 1/4-turn ball valve on cold water inlet
5. Install expansion tank, adjusted to home water pressure (typically 50-60 PSI)
6. Fit new gas shutoff valve on gas line
7. Attach new flexible gas supply line with sediment trap
8. Secure unit with Unistrut mounting and earthquake straps
9. Reconnect to existing T&P relief valve exit point
10. Insulate water supply lines for efficiency
11. Install copper bonding wire from water lines to gas line for grounding
Venting and Combustion:
1. Install venting per manufacturer’s specs (e.g., double-wall or single-wall as required)
2. Secure single-wall vent connections with 3 screws each
3. Verify adequate combustion air supply per code
Testing and Startup:
1. Pressure-test gas and water connections for leaks
2. Fill tank and purge air from lines
3. Test T&P relief valve operation
4. Light pilot, set temperature to 120°F (or per client preference), and confirm burner ignition
5. Validate full operational status
Cleanup and Final Steps:
1. Clear debris from work area
2. Haul away old unit for disposal
3. Conduct final inspection with client walkthrough
Notes:
- Estimate valid for 30 days from issuance
- Permit fees, if required, are included as a separate line item
- Unforeseen issues or additional work will be quoted separately with client approval
- Exclusions: Drywall, paint, stucco, tile, concrete, stone repairs, or existing water damage
- Duration: 3-4 hours, 1 technician
- Warranty: Manufacturer - 6 years parts, 1 year labor.
- Qualifies for applicable utility rebates and federal tax credits (where available)Finance $3294.00
The unit is outside in the closet
- Date Ranges
- Date Ranges: 2026 - Q1
- Plumbing
- Plumbing: HVAC Install
Cheryl Licht, CA
- Date Ranges
- Date Ranges: 2026 - Q1
- Plumbing
- Plumbing: HVAC Install
Xuandai Tran, CA
Material load Wed 1/8Insp wed 1/8
Customer would like to paint the wood that needs to be replaced.
- Date Ranges
- Date Ranges: 2026 - Q1
- Plumbing
- Plumbing: HVAC Install
Customer Testimonials
There are no testimonials at this time. Check back later!