This project will begin with the replacement of the shingle roof sections only. The flat roof sections will be completed at a later time this year after coordination with Blauch and Max Troyer to relocate the existing AC units from the flat roof areas.
The shingle roof installation will include an In-House roofing system in Patriot Red shingles with white drip edge for a clean, finished appearance.
The project includes:
- Removal and disposal of the existing satellite dish.
- Removal of all existing box vents, as they are currently leaking and are no longer needed with the new ridge vent system.
- Installation of ridge ventilation as part of the roofing system.
- Replacement of roof decking with 5/8-inch sheathing as needed.
We were honored to serve this commercial building in Harrisonburg, VA. This project was completed on 11/19/26. As part of this project, our crew completed an EPDM roofing layover on the upper middle triangular flat roof section only. The new EPDM membrane provides a durable, weather-resistant roofing surface designed to help protect the building from water intrusion and provide long-lasting performance.
A dog box was installed to allow Blauch Brothers to properly route and organize all necessary air conditioning (AC) lines. All AC units were disconnected to accommodate the roofing work and allow our crew to complete the installation properly. We also installed black coping along the designated roof edges to provide a clean, finished appearance while helping protect the roof perimeter from weather exposure and moisture.
Special attention was given to the existing lightning rods, which were required to remain in place throughout the project and were not removed.
We appreciate the opportunity to serve this commercial building in Harrisonburg and provide quality workmanship, attention to detail, and dependable commercial roofing services throughout the Shenandoah Valley through Holloway Roofing.