I wasn’t satisfied with the level of professionalism. Scheduling felt disorganized, and timelines kept changing without much notice. The end result was okay, but the overall experience could have been much better.
Everett Chavez

Removal of over 130,000 pounds of slate that had an issue with water penitrating surface to replace with 3/8"-1/2" Spanish black slate and all copper accents.
Hail damaged Roof replacement. Wind damage to copper steeple. TAMKO Shingles




