Felt the cost was very high, so I asked for an itemized bill for parts and labor. They said they do not itemize their bills, but go by the book. So I have no idea how much I paid for labor, how much I paid for parts. I was given a grand total price and that was it. I am sure it was not a fair price, because adding up the labor from the book for all the different things they did would be much longer than they actually spent on site.
George Goodridge
